A LOLER inspection checklist helps duty holders prove that their lifting equipment is examined, marked and used safely under the Lifting Operations and Lifting Equipment Regulations 1998. It gives site managers, maintenance leads and safety teams one record of each item’s examination status, defects and day-to-day checks.
The checklists on this page cover the main LOLER scenarios:
With the GoAudits Safety Inspection App, you can:
Save Time with Digital Inspections
A LOLER inspection checklist is a structured record that shows lifting equipment is in date for thorough examination, free of unresolved defects, correctly marked and used under a planned lift. It turns the duties in LOLER regulations 4 to 11 into checks a team can complete and sign off.
LOLER covers any work equipment that lifts or lowers loads, plus the accessories used to attach the load. Common examples include:
The duty holder’s own team fills it in: the employer, site manager or person in control of the equipment. It sits alongside the competent person’s thorough examination report rather than replacing it. Northern Ireland applies the same duties through its own 1999 LOLER regulations.
For wider site safety checks beyond lifting, the health safety audit checklist library covers general workplace audits.
A LOLER inspection checklist records three levels of check, each done by a different person at a different frequency. A good checklist keeps them visibly separate, because each has its own owner, frequency and record.
Operators check the equipment before each use or at the start of each shift, looking for damage, missing markings, faulty limit switches or worn sling stitching. The checklist confirms these checks happen and that operators are trained to do them.
Where wear, weather or heavy use could cause deterioration, LOLER requires regular inspections between thorough examinations. A competent member of staff usually carries them out. The results must be recorded and kept until the next record is made.
A thorough examination is a detailed, systematic examination by a competent person, followed by a written report. Unless an examination scheme sets other intervals, it is due:
The examiner should be independent of the people who maintain the equipment, so they are not assessing their own work. HSE guidance on thorough examinations sets out what the examination covers and when testing is needed.
👉 LOLER requirement: Reports of a first thorough examination must be kept for as long as the equipment is in use. Periodic reports must be kept until the next report is made or for 2 years, whichever is later. Your checklist should confirm each one is on file.
A LOLER inspection checklist includes the equipment’s identity and examination status, its condition, the setup of each lift and controls for lifting people. The template’s 62 items fall into five areas.
These items link each check to one identifiable piece of equipment and its paperwork.
Slings, chains and shackles take heavy wear, which is why LOLER puts accessories on the shorter 6-month cycle.
A LOLER certificate is the report of thorough examination written by the competent person. HSE sets no fixed format for it, but the report must contain every item listed in Schedule 1 of LOLER. Northern Ireland’s HSENI notes that its inspectors ask to see thorough examination reports rather than “certificates”.
A compliant report includes:
A “LOLER test certificate template” usually means the same document. Most lifting equipment does not need routine load testing, and the competent person decides whether a test is needed.
Two rules are often misreported. When the examiner reports a defect that is or could become dangerous, you must keep the equipment out of use until it is fixed, or past the date set in the report. A copy goes to the enforcing authority only where the defect involves an existing or imminent risk of serious personal injury.
The checklist does not reproduce the certificate. It confirms the certificate exists, is in date and has been acted on, which is what an inspector will ask to see.
A LOLER inspection sheet works best run per item of equipment and tied to that item’s examination dates, whether you start from the LOLER inspection sheet template or the app.
List every lifting machine and accessory with an ID number, location and SWL, so each sheet and report matches one item.
Record whether the item is on a 6-month cycle, a 12-month cycle or an examination scheme, and enter the next due date.
Fill in the equipment and examination sections for every item. Mark the lift and lifting people sections N/A when no lift is under way.
Take any defective item out of use and record why, with the repair deadline from the examiner’s report.
When the thorough examination report arrives, attach it to the item’s record and update the next due date.
LOLER checks sit on top of the general duties for work equipment. Use a PUWER inspection checklist for the wider maintenance and guarding duties that apply to the same machines. The guide to equipment inspection covers how to run routine inspections across all plant.
👉 Tasks & Workflows: Turn each failed LOLER item into a corrective action with an owner and a due date that matches the examiner’s timescale. Action assignees do not need a paid licence, so contractors and maintenance staff can close actions directly.
A LOLER checklist applies to every patient hoist, bath hoist, standing aid and sling in a care home, because these are people-lifting equipment. Each LOLER hoist and its slings must be thoroughly examined at least every 6 months, and the checklist tracks those dates alongside daily checks.
On 16 September 2026, MHRA issued the September 2026 National Patient Safety Alert on hoists and slings. It applies to care homes, nursing homes, hospitals and equipment providers. MHRA received 22 reports of fatal incidents during patient transfers between 2015 and 2025, and the alert gives organisations until 16 September 2027 to act. CQC may take regulatory action where the actions are not completed.
The alert asks providers to:
The template on this page covers most of these points through its examination status, accessories and lifting people sections. Add approved hoist and sling pairings to the equipment register and it evidences both the alert and LOLER. Run it in the same audit calendar as your CQC inspection checklist, or across several homes with care home auditing software.
👉 Case Study: How Bill Rogerson Safety delivers inspection reports to clients the moment each visit ends
GoAudits gives duty holders, safety managers and LOLER consultants one safety inspection app to track every lifting item from pre-use check to thorough examination.
On building sites, construction inspection software puts LOLER checks in the same system as daily site audits.
No. LOLER does not require a specific checklist, but it does require examinations, inspections and records for all lifting equipment. A LOLER inspection checklist is the simplest way to prove those duties are met, instead of piecing evidence together from certificates and emails during an HSE visit.
Yes. The LOLER inspection checklist PDF is free to download from this page. Most teams then run it in the app, where each check is timestamped, photos sit against the failed item and next examination dates are tracked. That record is far easier to show an inspector than a folder of printouts.
Yes. Forklifts, telehandlers and vehicle tail lifts all count as lifting equipment, so the same LOLER inspection form covers their examination status, marking and defects. Machine-specific items, such as forks, mast chains or tail lift platforms, are best covered by the dedicated checklists in the related templates list.
Yes. Use the LOLER checklist template to confirm hired-in equipment arrives with evidence of its last thorough examination, as LOLER requires. Record the next due date and run pre-use checks as you would for your own equipment. If the hire runs past that date, arrange the examination first.