LOLER Inspection Checklist Templates: Free Sheets, Forms and PDF

Template Library > Health & Safety> LOLER Inspection Checklist

LOLER inspection checklist templates for cranes, hoists, forklifts, MEWPs and slings, covering pre-use checks, inspections between examinations and thorough examination records. Available in PDF or in-app.

What These LOLER Inspection Checklist Templates Cover

A LOLER inspection checklist helps duty holders prove that their lifting equipment is examined, marked and used safely under the Lifting Operations and Lifting Equipment Regulations 1998. It gives site managers, maintenance leads and safety teams one record of each item’s examination status, defects and day-to-day checks.

The checklists on this page cover the main LOLER scenarios:

  • Full LOLER inspection checklist for examination status, records and live lifts
  • Lifting equipment inspection checklist for a shorter equipment condition check
  • Machine-specific checklists for tail lifts, telehandlers, cranes, MEWPs and forklifts

With the GoAudits Safety Inspection App, you can:

68 questions in 9 sectionsInteractive preview: try the answers

Section 1 of 9 · 6 questions

Equipment Details

  1. Equipment type and description

  2. Make, model and serial or ID number

  3. Safe working load (SWL) for each configuration

  4. Used for lifting goods, people, or both

  5. Date of last thorough examination

  6. Date next thorough examination is due

Section 2 of 9 · 15 questions

Thorough Examination And Records

  1. Equipment is listed on the site lifting equipment register

  2. A current thorough examination report is on file for the equipment

  3. Thorough examination is in date: 6 months for accessories and people-lifting equipment, 12 months otherwise

  4. Where an examination scheme sets the intervals, a competent person drew it up and it is followed

  5. Equipment was thoroughly examined after installation at this location, where safety depends on installation

  6. Equipment was re-examined after any accident, damage, modification or long period out of use

  7. Inspections between thorough examinations are carried out where conditions cause deterioration

  8. Results of those inspections are recorded and kept until the next record is made

  9. Defects listed in the last report were corrected within the timescale stated

  10. Equipment with a reported defect is not used until it is rectified, or beyond the date set in the examination report

  11. A Declaration of Conformity (UKCA or CE) is kept for as long as the equipment is used

  12. The report of the first thorough examination is kept for as long as the equipment is in use (2 years for accessories

  13. Installation examination reports are kept for as long as the equipment is used at this location

  14. Periodic examination reports are kept until the next report, or for 2 years, whichever is later

  15. Hired-in or transferred equipment arrived with evidence of its last thorough examination

Section 3 of 9 · 10 questions

Pre-use Checks

  1. Operators carry out pre-use checks before using the equipment each day or shift

  2. Pre-use checks follow the manufacturer’s instructions for that equipment

  3. The equipment structure shows no visible damage, deformation or corrosion

  4. Rated capacity indicators, limit switches and other safety devices work correctly

  5. Controls, brakes and emergency stops work correctly

  6. Controls, brakes and emergency stops work correctly

  7. Hooks have working safety catches and show no signs of opening, wear or damage

  8. Accessories are checked before each use

  9. Faults found during pre-use checks are reported before the equipment is used

  10. Faulty equipment is tagged out of use until a competent person clears it

Section 4 of 9 · 5 questions

Lift Planning And Competence

  1. Lifting operations are planned by a competent person

  2. Each lift has a plan suited to its complexity, written for non-routine or complex lifts

  3. Lift plans set weather limits, including maximum wind speed, for stopping work

  4. A procedure is in place for lifting loads of unknown weight

  5. Operators, slingers and signallers are trained and authorised for their role

Section 5 of 9 · 5 questions

Marking

  1. SWL is clearly marked on the equipment

  2. Where SWL changes with configuration, the SWL for each configuration is marked or displayed

  3. Lifting accessories are marked with their SWL and an ID number

  4. Equipment designed for lifting people is marked with the maximum number of people and SWL

  5. Equipment not designed for lifting people is marked as such where it could be misused

Section 6 of 9 · 8 questions

Positioning And Stability

  1. Equipment is positioned so loads do not pass over people

  2. Trapping and crushing points around the equipment are guarded or designed out

  3. Collision risk with nearby lifting equipment, structures and buildings is controlled

  4. Overhead power lines near the lifting area are identified and controlled

  5. Shafts and hoistways are fenced or gated to prevent falls

  6. Ground conditions can bear the combined weight of the equipment and load

  7. Outriggers or stabilisers are fully deployed on suitable spreader mats or pads

  8. Equipment is set up within the manufacturer's limits for slope and gradient

Section 7 of 9 · 5 questions

Lifting Accessories And Storage

  1. Accessories are compatible with the load and the lifting equipment

  2. Slings are protected from sharp edges with packing or edge protectors

  3. Damaged or unmarked accessories are quarantined and taken out of use

  4. Accessories are stored in a dry place that prevents damage and deterioration

  5. Hoist and sling combinations are confirmed compatible in the manufacturer’s instructions

Section 8 of 9 · 9 questions

Lifting Operation In Progress

  1. The lifting area is barriered or controlled to keep out unauthorised people

  2. A competent person supervises the lift

  3. Signals or radio procedures are agreed and understood by everyone involved in the lift

  4. A banksman or signaller guides the operator where the view of the load is blocked

  5. The load weight and centre of gravity are confirmed before lifting

  6. Loads that could break up or slip are wrapped, netted or otherwise secured

  7. Load swing is controlled, using tag lines where needed

  8. Loads are not dragged or side-loaded

  9. Loads are only left suspended when the area beneath is closed off

Section 9 of 9 · 5 questions

Lifting People

  1. Only equipment designed or adapted for lifting people is used to lift them

  2. The number of occupants stays within the marked limit

  3. People being lifted can communicate with the operator at all times

  4. A rescue plan is in place for a stranded or injured occupant

  5. Carriers have edge protection and gates that cannot open outwards

Checklist by GoAudits. This checklist is an example: we do not guarantee compliance with the laws applicable to your territory or industry. Seek professional advice to adapt it to your workplace or jurisdiction.

68 questions in 9 sectionsInteractive preview: try the answers

Section 1 of 9 · 6 questions

Equipment Details

  1. Equipment type and description

  2. Make, model and serial or ID number

  3. Safe working load (SWL) for each configuration

  4. Used for lifting goods, people, or both

  5. Date of last thorough examination

  6. Date next thorough examination is due

Section 2 of 9 · 15 questions

Thorough Examination And Records

  1. Equipment is listed on the site lifting equipment register

  2. A current thorough examination report is on file for the equipment

  3. Thorough examination is in date: 6 months for accessories and people-lifting equipment, 12 months otherwise

  4. Where an examination scheme sets the intervals, a competent person drew it up and it is followed

  5. Equipment was thoroughly examined after installation at this location, where safety depends on installation

  6. Equipment was re-examined after any accident, damage, modification or long period out of use

  7. Inspections between thorough examinations are carried out where conditions cause deterioration

  8. Results of those inspections are recorded and kept until the next record is made

  9. Defects listed in the last report were corrected within the timescale stated

  10. Equipment with a reported defect is not used until it is rectified, or beyond the date set in the examination report

  11. A Declaration of Conformity (UKCA or CE) is kept for as long as the equipment is used

  12. The report of the first thorough examination is kept for as long as the equipment is in use (2 years for accessories

  13. Installation examination reports are kept for as long as the equipment is used at this location

  14. Periodic examination reports are kept until the next report, or for 2 years, whichever is later

  15. Hired-in or transferred equipment arrived with evidence of its last thorough examination

Section 3 of 9 · 10 questions

Pre-use Checks

  1. Operators carry out pre-use checks before using the equipment each day or shift

  2. Pre-use checks follow the manufacturer’s instructions for that equipment

  3. The equipment structure shows no visible damage, deformation or corrosion

  4. Rated capacity indicators, limit switches and other safety devices work correctly

  5. Controls, brakes and emergency stops work correctly

  6. Controls, brakes and emergency stops work correctly

  7. Hooks have working safety catches and show no signs of opening, wear or damage

  8. Accessories are checked before each use

  9. Faults found during pre-use checks are reported before the equipment is used

  10. Faulty equipment is tagged out of use until a competent person clears it

Section 4 of 9 · 5 questions

Lift Planning And Competence

  1. Lifting operations are planned by a competent person

  2. Each lift has a plan suited to its complexity, written for non-routine or complex lifts

  3. Lift plans set weather limits, including maximum wind speed, for stopping work

  4. A procedure is in place for lifting loads of unknown weight

  5. Operators, slingers and signallers are trained and authorised for their role

Section 5 of 9 · 5 questions

Marking

  1. SWL is clearly marked on the equipment

  2. Where SWL changes with configuration, the SWL for each configuration is marked or displayed

  3. Lifting accessories are marked with their SWL and an ID number

  4. Equipment designed for lifting people is marked with the maximum number of people and SWL

  5. Equipment not designed for lifting people is marked as such where it could be misused

Section 6 of 9 · 8 questions

Positioning And Stability

  1. Equipment is positioned so loads do not pass over people

  2. Trapping and crushing points around the equipment are guarded or designed out

  3. Collision risk with nearby lifting equipment, structures and buildings is controlled

  4. Overhead power lines near the lifting area are identified and controlled

  5. Shafts and hoistways are fenced or gated to prevent falls

  6. Ground conditions can bear the combined weight of the equipment and load

  7. Outriggers or stabilisers are fully deployed on suitable spreader mats or pads

  8. Equipment is set up within the manufacturer's limits for slope and gradient

Section 7 of 9 · 5 questions

Lifting Accessories And Storage

  1. Accessories are compatible with the load and the lifting equipment

  2. Slings are protected from sharp edges with packing or edge protectors

  3. Damaged or unmarked accessories are quarantined and taken out of use

  4. Accessories are stored in a dry place that prevents damage and deterioration

  5. Hoist and sling combinations are confirmed compatible in the manufacturer’s instructions

Section 8 of 9 · 9 questions

Lifting Operation In Progress

  1. The lifting area is barriered or controlled to keep out unauthorised people

  2. A competent person supervises the lift

  3. Signals or radio procedures are agreed and understood by everyone involved in the lift

  4. A banksman or signaller guides the operator where the view of the load is blocked

  5. The load weight and centre of gravity are confirmed before lifting

  6. Loads that could break up or slip are wrapped, netted or otherwise secured

  7. Load swing is controlled, using tag lines where needed

  8. Loads are not dragged or side-loaded

  9. Loads are only left suspended when the area beneath is closed off

Section 9 of 9 · 5 questions

Lifting People

  1. Only equipment designed or adapted for lifting people is used to lift them

  2. The number of occupants stays within the marked limit

  3. People being lifted can communicate with the operator at all times

  4. A rescue plan is in place for a stranded or injured occupant

  5. Carriers have edge protection and gates that cannot open outwards

Checklist by GoAudits. This checklist is an example: we do not guarantee compliance with the laws applicable to your territory or industry. Seek professional advice to adapt it to your workplace or jurisdiction.

Save Time with Digital Inspections

What is a LOLER Inspection Checklist?

A LOLER inspection checklist is a structured record that shows lifting equipment is in date for thorough examination, free of unresolved defects, correctly marked and used under a planned lift. It turns the duties in LOLER regulations 4 to 11 into checks a team can complete and sign off.

LOLER covers any work equipment that lifts or lowers loads, plus the accessories used to attach the load. Common examples include:

  • Overhead, mobile and truck-mounted cranes
  • Forklifts, telehandlers and vehicle tail lifts
  • MEWPs, passenger lifts and goods hoists
  • Patient hoists and bath hoists in care settings
  • Slings, shackles, chains, eyebolts and lifting beams

The duty holder’s own team fills it in: the employer, site manager or person in control of the equipment. It sits alongside the competent person’s thorough examination report rather than replacing it. Northern Ireland applies the same duties through its own 1999 LOLER regulations.

For wider site safety checks beyond lifting, the health safety audit checklist library covers general workplace audits.

Which LOLER Checks Does a LOLER Inspection Checklist Record?

A LOLER inspection checklist records three levels of check, each done by a different person at a different frequency. A good checklist keeps them visibly separate, because each has its own owner, frequency and record.

1. Pre-use checks

Operators check the equipment before each use or at the start of each shift, looking for damage, missing markings, faulty limit switches or worn sling stitching. The checklist confirms these checks happen and that operators are trained to do them.

2. Inspections between thorough examinations

Where wear, weather or heavy use could cause deterioration, LOLER requires regular inspections between thorough examinations. A competent member of staff usually carries them out. The results must be recorded and kept until the next record is made.

3. Thorough examinations

A thorough examination is a detailed, systematic examination by a competent person, followed by a written report. Unless an examination scheme sets other intervals, it is due:

  • At least every 6 months for lifting accessories and equipment used to lift people
  • At least every 12 months for all other lifting equipment
  • Before first use, unless the equipment is new and comes with a recent declaration of conformity
  • After installation, where safety depends on how the equipment is installed
  • After exceptional circumstances, such as damage, an accident or a long period out of use

The examiner should be independent of the people who maintain the equipment, so they are not assessing their own work. HSE guidance on thorough examinations sets out what the examination covers and when testing is needed.

👉 LOLER requirement: Reports of a first thorough examination must be kept for as long as the equipment is in use. Periodic reports must be kept until the next report is made or for 2 years, whichever is later. Your checklist should confirm each one is on file.

What Does a LOLER Inspection Checklist Include?

A LOLER inspection checklist includes the equipment’s identity and examination status, its condition, the setup of each lift and controls for lifting people. The template’s 62 items fall into five areas.

Equipment record and examination status

These items link each check to one identifiable piece of equipment and its paperwork.

  • Equipment type, make, model and serial or ID number
  • Safe working load (SWL) for each configuration
  • Dates of the last and next thorough examination
  • Listing on the site lifting equipment register
  • Current thorough examination report on file
  • Defects from the last report corrected within the stated timescale
  • Declaration of conformity and past reports kept for the required periods
  • Evidence of last examination for hired-in or transferred equipment

Pre-use checks and marking 

  • Operator pre-use checks completed each day or shift
  • No visible damage, deformation or corrosion
  • Safety devices, controls, brakes and emergency stops working
  • Hook safety catches working, with no wear or damage
  • Faults reported and faulty equipment tagged out of use
  • SWL clearly marked, including for each configuration
  • Accessories marked with SWL and an ID number
  • Equipment for lifting people marked with maximum occupants

Lift planning, positioning and stability

  • Lifts planned by a competent person, with written plans for complex lifts
  • Weather limits, including maximum wind speed, set in the plan
  • Loads kept clear of people, with trapping points guarded
  • Overhead power lines and nearby structures controlled
  • Ground conditions, outriggers and spreader mats suitable for the load

Lifting accessories and the lift in progress

Slings, chains and shackles take heavy wear, which is why LOLER puts accessories on the shorter 6-month cycle.

  • Accessories compatible with the load and the equipment
  • Damaged or unmarked accessories quarantined
  • Lifting area barriered and supervised
  • Signals agreed and a banksman used where the view is blocked
  • Load weight and centre of gravity confirmed before lifting

Lifting people

  • Only equipment designed or adapted for lifting people used
  • Occupant numbers within the marked limit
  • Communication with the operator at all times
  • A rescue plan for a stranded or injured occupant

What Goes On a LOLER Certificate Template?

A LOLER certificate is the report of thorough examination written by the competent person. HSE sets no fixed format for it, but the report must contain every item listed in Schedule 1 of LOLER. Northern Ireland’s HSENI notes that its inspectors ask to see thorough examination reports rather than “certificates”.

A compliant report includes:

  • The name and address of the employer and the premises
  • Details that identify the equipment, including its SWL
  • The date of the examination and of the last examination
  • The reason for the examination: interval, scheme, installation or exceptional circumstances
  • Any defect that is or could become dangerous, and the repair needed
  • The deadline for fixing defects that are not yet dangerous
  • The latest date for the next thorough examination
  • Details of any test carried out
  • The examiner’s name and qualifications, and the date of the report

A “LOLER test certificate template” usually means the same document. Most lifting equipment does not need routine load testing, and the competent person decides whether a test is needed.

Two rules are often misreported. When the examiner reports a defect that is or could become dangerous, you must keep the equipment out of use until it is fixed, or past the date set in the report. A copy goes to the enforcing authority only where the defect involves an existing or imminent risk of serious personal injury.

The checklist does not reproduce the certificate. It confirms the certificate exists, is in date and has been acted on, which is what an inspector will ask to see.

How to Use a LOLER Inspection Sheet

A LOLER inspection sheet works best run per item of equipment and tied to that item’s examination dates, whether you start from the LOLER inspection sheet template or the app.

Step 1: Build the lifting equipment register

List every lifting machine and accessory with an ID number, location and SWL, so each sheet and report matches one item.

Step 2: Set each item’s examination interval

Record whether the item is on a 6-month cycle, a 12-month cycle or an examination scheme, and enter the next due date.

Step 3: Complete the sheet for each item

Fill in the equipment and examination sections for every item. Mark the lift and lifting people sections N/A when no lift is under way.

Step 4: Quarantine and log defects

Take any defective item out of use and record why, with the repair deadline from the examiner’s report.

Step 5: File the examiner’s report against the item

When the thorough examination report arrives, attach it to the item’s record and update the next due date.

LOLER checks sit on top of the general duties for work equipment. Use a PUWER inspection checklist for the wider maintenance and guarding duties that apply to the same machines. The guide to equipment inspection covers how to run routine inspections across all plant.

👉 Tasks & Workflows: Turn each failed LOLER item into a corrective action with an owner and a due date that matches the examiner’s timescale. Action assignees do not need a paid licence, so contractors and maintenance staff can close actions directly.

Using a LOLER Checklist for Care Home Hoists and Slings

A LOLER checklist applies to every patient hoist, bath hoist, standing aid and sling in a care home, because these are people-lifting equipment. Each LOLER hoist and its slings must be thoroughly examined at least every 6 months, and the checklist tracks those dates alongside daily checks.

LOLER hoist checks under the September 2026 patient safety alert

On 16 September 2026, MHRA issued the September 2026 National Patient Safety Alert on hoists and slings. It applies to care homes, nursing homes, hospitals and equipment providers. MHRA received 22 reports of fatal incidents during patient transfers between 2015 and 2025, and the alert gives organisations until 16 September 2027 to act. CQC may take regulatory action where the actions are not completed.

The alert asks providers to:

  • Run standardised pre-use checks on every hoist and sling, including a pause after initial load take-up
  • Record which hoist and sling combinations are approved as compatible
  • Keep an inventory with last and next LOLER examination dates for each device
  • Remove any hoist with an overdue examination or unresolved defect
  • Train staff on pre-use checks, fitting and escalation

The template on this page covers most of these points through its examination status, accessories and lifting people sections. Add approved hoist and sling pairings to the equipment register and it evidences both the alert and LOLER. Run it in the same audit calendar as your CQC inspection checklist, or across several homes with care home auditing software.

How GoAudits Helps With LOLER Inspections

GoAudits gives duty holders, safety managers and LOLER consultants one safety inspection app to track every lifting item from pre-use check to thorough examination.

  • Schedule recurring LOLER checks per item on 6-month or 12-month cycles, with reminders when each check is due
  • Attach timestamped photos of damaged slings, hooks or markings to the exact checklist item that failed
  • Assign defects as corrective actions with owners and deadlines, and track them until closed
  • Track inspection results and open defects across every site on one dashboard, from depots to building projects
  • Complete checks offline in plant rooms, basements and lift shafts, with automatic sync when signal returns

On building sites, construction inspection software puts LOLER checks in the same system as daily site audits.

FAQs

Is a LOLER inspection checklist a legal requirement?

No. LOLER does not require a specific checklist, but it does require examinations, inspections and records for all lifting equipment. A LOLER inspection checklist is the simplest way to prove those duties are met, instead of piecing evidence together from certificates and emails during an HSE visit.

Can I download the LOLER inspection checklist as a PDF?

Yes. The LOLER inspection checklist PDF is free to download from this page. Most teams then run it in the app, where each check is timestamped, photos sit against the failed item and next examination dates are tracked. That record is far easier to show an inspector than a folder of printouts.

Does a LOLER inspection form work for forklifts, telehandlers and tail lifts?

Yes. Forklifts, telehandlers and vehicle tail lifts all count as lifting equipment, so the same LOLER inspection form covers their examination status, marking and defects. Machine-specific items, such as forks, mast chains or tail lift platforms, are best covered by the dedicated checklists in the related templates list.

Can I use a LOLER checklist template for hired-in lifting equipment?

Yes. Use the LOLER checklist template to confirm hired-in equipment arrives with evidence of its last thorough examination, as LOLER requires. Record the next due date and run pre-use checks as you would for your own equipment. If the hire runs past that date, arrange the examination first.