LOLER Inspection Checklist
68 questions in 9 sectionsInteractive preview: try the answers
Section 1 of 9 · 6 questionsEquipment Details
Equipment type and description
Make, model and serial or ID number
Safe working load (SWL) for each configuration
Used for lifting goods, people, or both
Date of last thorough examination
Date next thorough examination is due
Section 2 of 9 · 15 questionsThorough Examination And Records
Equipment is listed on the site lifting equipment register
A current thorough examination report is on file for the equipment
Thorough examination is in date: 6 months for accessories and people-lifting equipment, 12 months otherwise
Where an examination scheme sets the intervals, a competent person drew it up and it is followed
Equipment was thoroughly examined after installation at this location, where safety depends on installation
Equipment was re-examined after any accident, damage, modification or long period out of use
Inspections between thorough examinations are carried out where conditions cause deterioration
Results of those inspections are recorded and kept until the next record is made
Defects listed in the last report were corrected within the timescale stated
Equipment with a reported defect is not used until it is rectified, or beyond the date set in the examination report
A Declaration of Conformity (UKCA or CE) is kept for as long as the equipment is used
The report of the first thorough examination is kept for as long as the equipment is in use (2 years for accessories
Installation examination reports are kept for as long as the equipment is used at this location
Periodic examination reports are kept until the next report, or for 2 years, whichever is later
Hired-in or transferred equipment arrived with evidence of its last thorough examination
Section 3 of 9 · 10 questionsPre-use Checks
Operators carry out pre-use checks before using the equipment each day or shift
Pre-use checks follow the manufacturer’s instructions for that equipment
The equipment structure shows no visible damage, deformation or corrosion
Rated capacity indicators, limit switches and other safety devices work correctly
Controls, brakes and emergency stops work correctly
Controls, brakes and emergency stops work correctly
Hooks have working safety catches and show no signs of opening, wear or damage
Accessories are checked before each use
Faults found during pre-use checks are reported before the equipment is used
Faulty equipment is tagged out of use until a competent person clears it
Section 4 of 9 · 5 questionsLift Planning And Competence
Lifting operations are planned by a competent person
Each lift has a plan suited to its complexity, written for non-routine or complex lifts
Lift plans set weather limits, including maximum wind speed, for stopping work
A procedure is in place for lifting loads of unknown weight
Operators, slingers and signallers are trained and authorised for their role
Section 5 of 9 · 5 questionsMarking
SWL is clearly marked on the equipment
Where SWL changes with configuration, the SWL for each configuration is marked or displayed
Lifting accessories are marked with their SWL and an ID number
Equipment designed for lifting people is marked with the maximum number of people and SWL
Equipment not designed for lifting people is marked as such where it could be misused
Section 6 of 9 · 8 questionsPositioning And Stability
Equipment is positioned so loads do not pass over people
Trapping and crushing points around the equipment are guarded or designed out
Collision risk with nearby lifting equipment, structures and buildings is controlled
Overhead power lines near the lifting area are identified and controlled
Shafts and hoistways are fenced or gated to prevent falls
Ground conditions can bear the combined weight of the equipment and load
Outriggers or stabilisers are fully deployed on suitable spreader mats or pads
Equipment is set up within the manufacturer's limits for slope and gradient
Section 7 of 9 · 5 questionsLifting Accessories And Storage
Accessories are compatible with the load and the lifting equipment
Slings are protected from sharp edges with packing or edge protectors
Damaged or unmarked accessories are quarantined and taken out of use
Accessories are stored in a dry place that prevents damage and deterioration
Hoist and sling combinations are confirmed compatible in the manufacturer’s instructions
Section 8 of 9 · 9 questionsLifting Operation In Progress
The lifting area is barriered or controlled to keep out unauthorised people
A competent person supervises the lift
Signals or radio procedures are agreed and understood by everyone involved in the lift
A banksman or signaller guides the operator where the view of the load is blocked
The load weight and centre of gravity are confirmed before lifting
Loads that could break up or slip are wrapped, netted or otherwise secured
Load swing is controlled, using tag lines where needed
Loads are not dragged or side-loaded
Loads are only left suspended when the area beneath is closed off
Section 9 of 9 · 5 questionsLifting People
Only equipment designed or adapted for lifting people is used to lift them
The number of occupants stays within the marked limit
People being lifted can communicate with the operator at all times
A rescue plan is in place for a stranded or injured occupant
Carriers have edge protection and gates that cannot open outwards
Checklist by GoAudits. This checklist is an example: we do not guarantee compliance with the laws applicable to your territory or industry. Seek professional advice to adapt it to your workplace or jurisdiction.
Free PDF
Download the LOLER Inspection Checklist
By downloading this checklist you agree to the GoAudits privacy policy and terms of service.
NEW! Try generating a custom checklist with our free AI tool:
Easy inspection app for your digital checklists
- Conduct inspections anytime, anywhere - even offline
- Capture photos as proof of compliance or areas needing attention
- Instantly generate and share detailed reports after the inspections
- Assign & track follow-up tasks, view historical trends on a centralized dashboard