HVAC Change Out Checklist

Use this HVAC Change Out Checklist to ensure all steps are followed during equipment replacement, from removal to installation and final system testing.

HVAC Change Out Checklist



Inspection

1. Has the existing HVAC system been thoroughly inspected for any issues?


Photo Comment

2. Has the ductwork been checked for leaks, damage, or poor condition?


Photo Comment

3. Are all electrical connections inspected for safety and compatibility?


Photo Comment

4. Is the thermostat functioning correctly and compatible with the new system?


Photo Comment
Permits And Permissions

1. Have all necessary permits been obtained prior to beginning the change-out?


Photo Comment

2. Has customer permission been verified and documented for the HVAC replacement?


Photo Comment
Safety Precautions

1. Has power to the HVAC system been shut off to ensure safety before work begins?


Photo Comment

2. Have all electrical connections been safely disconnected from the old system?


Photo Comment

3. Has the refrigerant been properly recovered and disposed of according to environmental regulations?


Photo Comment
Component Removal

1. Have all old system components been removed carefully and completely (thermostat, indoor unit, outdoor unit, filters)?


Photo Comment
Installation

1. Has the foundation for the new unit been prepared and leveled properly?


Photo Comment

2. Has the new thermostat been installed according to the manufacturer’s specifications?


Photo Comment

3. Have the indoor and outdoor units been positioned and secured properly?


Photo Comment

4. Are all refrigerant lines and electrical wiring connected securely and in compliance with code?


Photo Comment

5. Has the ductwork been inspected and repaired (if necessary) before connecting to the new system?


Photo Comment
System Testing

1. Are refrigerant levels correctly charged and verified?


Photo Comment

2. Are all electrical connections tested for proper function and safety?


Photo Comment

3. Is proper airflow confirmed throughout the system?


Photo Comment

4. Does the thermostat operate correctly and control the system as expected?


Photo Comment
Customer Walkthrough

1. Has the customer been given a clear explanation of the new system’s operation?


Photo Comment

2. Have maintenance tips been provided to help ensure long-term performance?


Photo Comment

3. Have all customer questions or concerns been answered satisfactorily?


Photo Comment
Final Documentation

1. Have the model and serial numbers of all new components been recorded?


Photo Comment

2. Has the refrigerant charge amount been documented?


Photo Comment

3. Has any additional work performed during installation been noted?


Photo Comment

4. Has the customer signed off on the completed work?


Photo Comment
Maintenance Schedule

1. Has a follow-up maintenance check-up been recommended for 6 months after installation?


Photo Comment

2. Has annual maintenance been scheduled or recommended to the customer?


Photo Comment
Competitor Analysis

1. Has the pricing for the change-out been compared with competitors to ensure it is competitive?


Photo Comment

2. Are warranty details for the new system clearly highlighted?


Photo Comment

3. Have any special features, rebates, or ongoing promotions been communicated to the customer?


Photo Comment

4. Are customer reviews and ratings available and shared to support the decision-making process?


Photo Comment

Is this sample what you are looking for?
Sign up to use & customise this template, or create your own custom checklist:

Checklist by GoAudits.com – Please note that this checklist is intended as an example. We do not guarantee compliance with the laws applicable to your territory or industry. You should seek professional advice to determine how this checklist should be adapted to your workplace or jurisdiction.

Easy inspection app for your digital checklists