OSHA Lockout Tagout (LOTO ) Inspection Checklist

Use the OSHA Lockout/Tagout (LOTO) Inspection Checklist to safeguard employees by controlling energy sources during equipment maintenance and repairs.

OSHA Lockout Tagout (LOTO ) Inspection Checklist



Lockout Tagout

1. Is all machinery or equipment capable of movement, required to be de-energized or disengaged and locked out during cleaning, servicing, adjusting, or setting up operations, whenever required?


Photo Comment

2. Where the power disconnecting means for equipment does not also disconnect the electrical control circuit: •Are the appropriate electrical enclosures identified? •Are means provided to ensure the control circuit can also be disconnected and locked out?


Photo Comment

3. Is the locking-out of control circuits in lieu of locking-out main power disconnects prohibited?


Photo Comment

4. Are all equipment control valve handles provided with a means for locking out?


Photo Comment

5. Does the lock-out procedure require that stored energy (mechanical, hydraulic, air, etc.) be released or blocked before equipment is locked out for repairs?


Photo Comment

6. Are appropriate employees provided with individually keyed personal safety locks?


Photo Comment

7. Are employees required to keep personal control of their key(s) while they have safety locks in use?


Photo Comment

8. Is it required that only the employee is exposed to the hazard, place or remove the safety lock?


Photo Comment

9. Is it required that employees check the safety of the lock-out by attempting a startup after making sure no one is exposed?


Photo Comment

10. Are employees instructed to always push the control circuit stop button immediately after checking the safety of the lock-out?


Photo Comment

11. Is there a means provided to identify any or all employees who are working on locked-out equipment by their locks or accompanying tags?


Photo Comment

12. Are a sufficient number of accident prevention signs or tags and safety padlocks provided for any reasonably foreseeable repair emergency?


Photo Comment

13. When machine operations, configuration, or size requires the operator to leave his or her control station to install tools or perform other operations, and that part of the machine could move if accidentally activated, is such element required to be separately locked or blocked out?In the event that equipment or lines cannot be shut down, locked out, and tagged, is a safe job procedure established and rigidly followed?


Photo Comment

Is this sample what you are looking for?
Sign up to use & customise this template, or create your own custom checklist:

Checklist by GoAudits.com – Please note that this checklist is intended as an example. We do not guarantee compliance with the laws applicable to your territory or industry. You should seek professional advice to determine how this checklist should be adapted to your workplace or jurisdiction.

Easy inspection app for your digital checklists