NDT Audit Checklist
63 questions in 10 sectionsInteractive preview: try the answers
Section 1 of 10 · 6 questionsNDT Quality System And Documentation
A documented NDT written practice or quality procedure is in place and current
The written practice defines the scope of NDT methods the facility is approved to perform
NDT procedures are controlled documents with revision status and approval signatures
A Level III is identified and responsible for technical oversight of the NDT program
The written practice references the governing codes, standards, and customer specifications
Procedures are accessible to technicians at each inspection location
Section 2 of 10 · 7 questionsPersonnel Qualification And Certification
All NDT personnel hold current certification for the methods and levels they perform
Certification records show training hours, experience, and examination results for each method
Annual near-vision and color vision tests are on file for all technicians
Certification is issued under the applicable scheme required by the code or customer
A current list identifies each technician's certified methods and levels
Recertification dates are tracked and none have lapsed
Level III qualifications are documented and current
Section 3 of 10 · 6 questionsNDT Procedures And Techniques
Each method has a written procedure approved by a Level III
Procedures are qualified or validated before use on production parts
Technique sheets specify parameters, coverage, and scan plans for the part inspected
Acceptance and rejection criteria match the governing code or specification
Procedure deviations are documented, justified, and approved before use
Procedures are reviewed and updated when codes or customer requirements change
Section 4 of 10 · 6 questionsEquipment And Instrument Control
All NDT equipment requiring calibration has current calibration records
Calibration is traceable to recognized reference standards
System performance checks are completed at the required intervals before use
Each instrument is uniquely identified and labeled with calibration status
Equipment found out of calibration is removed from service and results are reviewed
A maintenance schedule exists and is followed for NDT equipment
Section 5 of 10 · 6 questionsConsumables And Reference Standards
Penetrants, developers, couplants, and other consumables are within their expiry dates
Batch certificates are on file for consumables affecting inspection sensitivity
Reference blocks and standards are identified, controlled, and within calibration
Consumable batch changes are recorded with verification of performance
Incompatible or restricted consumables are segregated and labeled
Radiographic film and processing chemistry are within shelf life (RT only)
Section 6 of 10 · 6 questionsReporting, Records, And Traceability
NDT reports identify the part, procedure, technique, and acceptance criteria used
Each report records the result, the technician, and the certification level
Reports are reviewed and accepted by authorized personnel before release
Inspection results are traceable to the specific part, batch, or weld
Records are retained for the period required by the code or customer
Rejected items are clearly identified and dispositioned
Section 7 of 10 · 5 questionsNon-Conformance And Corrective Action
A documented process exists for handling non-conforming inspection results
Non-conformances are recorded with cause analysis and corrective action
Corrective actions are verified for effectiveness and closed out
Recurring non-conformances are escalated and trended
Internal NDT audits are conducted at planned intervals and recorded
Section 8 of 10 · 5 questionsEnvironment And Facility Conditions
Inspection areas have the lighting intensity required for the method
Penetrant line stations have adequate drainage and ventilation
The radiography area has shielding, warning signs, and controlled access (RT only)
Surface temperature and ambient conditions are within procedure limits
Work areas are clean and free of contamination that could mask indications
Section 9 of 10 · 10 questionsMethod Controls (witnessed)
Liquid penetrant dwell and processing times follow the written procedure (PT)
Penetrant system sensitivity is verified using a reference panel (PT)
Magnetic particle field strength and direction are verified before inspection (MT)
Demagnetization and post-inspection cleaning are performed where required (MT)
Image quality indicators confirm required sensitivity on each radiograph (RT)
Radiographic density and technique fall within procedure limits (RT)
Ultrasonic calibration is set and rechecked against the correct reference standard (UT)
Ultrasonic scan coverage and overlap meet the technique requirements (UT)
Eddy current reference standards and instrument settings match the procedure (ET)
Visual inspection lighting and surface access meet the procedure requirements (VT)
Section 10 of 10 · 6 questionsWitnessed Inspection
The technician performing the inspection is certified for that method and part
The technician follows the applicable procedure and technique sheet during inspection
Parts are correctly identified and inspection coverage matches the requirement
Indications are evaluated against the correct acceptance criteria
Results are recorded accurately at the time of inspection
Equipment and consumables in use match those specified in the procedure
Checklist by GoAudits. This checklist is an example: we do not guarantee compliance with the laws applicable to your territory or industry. Seek professional advice to adapt it to your workplace or jurisdiction.
Free PDF
Download the NDT Audit Checklist
By downloading this checklist you agree to the GoAudits privacy policy and terms of service.
NEW! Try generating a custom checklist with our free AI tool:
Easy inspection app for your digital checklists
- Conduct inspections anytime, anywhere - even offline
- Capture photos as proof of compliance or areas needing attention
- Instantly generate and share detailed reports after the inspections
- Assign & track follow-up tasks, view historical trends on a centralized dashboard