Manufacturing Process Audit Checklist

Use the Manufacturing Process Audit Checklist to evaluate and optimize manufacturing processes, ensuring adherence to quality and efficiency standards.

Manufacturing Process Audit Checklist



CP & CPK

1. Does the control plan specify SPC monitoring? If yes, have at least three months’ records of process stability been checked? If the process is stable, is the capability index (as per the control plan) maintained or exceeded? If these are not in place, is an NCR raised?


Photo Comment

2. If the three months data does not lead to any conclusion on effectiveness, is another three-month previous data examined?


Photo Comment

3. In a borderline case of the above, can it be classified as "Needs Improvements," and is an NCR raised?


Photo Comment
Process Control Parameters

1. If process control parameters as per the control plan are found to be nonconforming, is the process classified as ineffective, and is a nonconformance report raised?


Photo Comment
Evaluation Of Manufacturing Process Effectiveness/Improvement

1. Are customer-end PPMs predictable and acceptable to the customer? (i.e., judged from complaints/rejections)


Photo Comment

2. If no, are additional controls implemented in the short term to ensure that the customer is protected until corrective actions are effective?


Photo Comment
Manufacturing Process

1. Is the manufacturing sequence as per the process flow?


Photo Comment

2. Are the parameters set as per the control plan/work instructions?


Photo Comment

3. Are necessary parameter values that are to be recorded updated and verified for any drift?


Photo Comment

4. Do process control and monitoring records indicate that the process was controlled within the specified process parameter?


Photo Comment

5. Is the frequency of process monitoring carried out as per the control plan/work instruction?


Photo Comment

6. Are SPC requirements met as specified in the control plan/work instruction? Is the process statistically stable?


Photo Comment

7. Is all MMD tooling, and equipment necessary for process controls available in good operating condition?


Photo Comment

8. Are special characteristics designated by appropriate symbols throughout the whole documentation and personnel are aware of them?


Photo Comment
In-process, Final, And Customer PPM

1. Have three months’ trends of in-process, final, and customer ppm data been checked?


Photo Comment

2. If the three months data does not lead to any conclusion on effectiveness, is another three-month previous data examined?


Photo Comment

3. Is there any quality objective or customer ppm target available?


Photo Comment

4. If yes, have monthly targets for in-house, final, and customer ppm been checked? - If they are not met, is there an analysis, action plan, and effective tracking in place? - If these are not satisfactory, is an NCR raised?


Photo Comment

5. If the trend shows a consistent and predictable variability, is the process considered effective regardless of the current ppm level? If there is an inconsistent pattern, is the process considered ineffective?


Photo Comment

6. In a borderline case of the above, can it be classified as "Needs Improvements," and is an NCR raised?


Photo Comment

Is this sample what you are looking for?
Sign up to use & customise this template, or create your own custom checklist: