Management of Change Checklist

Use the Management of Change checklist to assess, plan, document and execute changes in processes, to avoid safety problems and maintain regulatory compliance.

Management of Change Checklist



Change Description

1. Who is requesting the change (names/titles)?


Photo Comment

2. Write a summary of the requested change?


Photo Comment

3. List the affected equipment/machinery.


Photo Comment

4. List the affected jobs/roles.


Photo Comment

5. List the affected procedures, tests, and/or inspections.


Photo Comment

6. List the affected reactive chemicals/materials, if applicable.


Photo Comment
Areas That Need Changing

1. Does Safety and Health need changing?


Photo Comment

2. Does the Environment need changing?


Photo Comment

3. Does Loss Prevention need changing?


Photo Comment

4. Do Operations need changing?


Photo Comment

5. Do Human Resources need changing?


Photo Comment
Proposed Length Of Change

1. What is the proposed length of change? •Emergency (Initiate and Finalize as soon as possible) •Permanent •Temporary (Include length of time in comments)


Photo Comment
Type Of Change

1. Are Facility Additions or Modifications proposed as a type of change? (Include details in comments)


Photo Comment

2. Are Equipment Changes or Modifications proposed as a type of change? (Include details in comments)


Photo Comment

3. Are Work Practices or Best Practices proposed as a type of change? (Include details in comments)


Photo Comment

4. Are IT/Computers/Systems proposed as a type of change? (Include details in comments)


Photo Comment

5. Are Subcontractors proposed as a type of change? (Include details in comments)


Photo Comment

6. Are Role Changes proposed as a type of change? (Include details in comments)


Photo Comment

7. Are Procedures/Processes/Methods/Operations proposed as a type of change? (Include details in comments)


Photo Comment

8. Are Chemicals/Contaminants/Products proposed as a type of change? (Include details in comments)


Photo Comment

9. Are Personnel Addition or Removal proposed as a type of change? (Include details in comments)


Photo Comment

10. Are Policies or Standards proposed as a type of change? (Include details in comments)


Photo Comment

11. Are Documentation or Records proposed as a type of change? (Include details in comments)


Photo Comment

12. Are individual’ Roles or Job Descriptions proposed as a type of change? (Include details in comments)


Photo Comment
Hazards Present

1. Are biological hazards involved in this change?


Photo Comment

2. Are Chemical/Contaminant/Product hazards involved in this change?


Photo Comment

3. Are Stored Energy/Electrical/Gas hazards involved in this change?


Photo Comment

4. Are Preparation/Training/Skills involved in this change?


Photo Comment

5. Is Access/Egress involved in this change?


Photo Comment

6. Is Emergency Planning involved in this change?


Photo Comment

7. Are Ergonomic issues involved in this change?


Photo Comment

8. Are Physical/Cuts/Burns/etc. hazards involved in this change?


Photo Comment

9. Is Confined Space involved in this change?


Photo Comment

10. Are Psychological issues involved in this change?


Photo Comment

11. Has a complete change risk assessment been performed?


Photo Comment
MOC Initiation & Change Approval

1. Do you have an MOC Leader/Coordinator ready to run point on this change?


Photo Comment

2. Do you have knowledgeable change reviewers ready to review the proposed changes?


Photo Comment

3. Do you have a change finalizer, if different from the MOC Coordinator?


Photo Comment

4. Does the description of the proposed change and all affected systems provide enough information?


Photo Comment

5. Have you identified all affected roles and personnel?


Photo Comment

6. Have you identified all affected contractors and temporary personnel?


Photo Comment

7. Has a change request been submitted?


Photo Comment

8. Has a change request been reviewed?


Photo Comment

9. Has a change request been approved?


Photo Comment

10. Have process engineering, technician, or manager personnel been consulted if needed?


Photo Comment

11. Has an equipment specifications and Maintenance/Parts technician consulted if needed?


Photo Comment

12. Will you be able to comply with all Federal, State, and Local safety and engineering standards during this change?


Photo Comment

13. Have all potential hazards and gaps been reviewed and discussed?


Photo Comment
Change Final Approval Process

1. List all the reviewers who have reviewed the change


Photo Comment

2. List all concerns brought up by reviewers


Photo Comment

3. Have concerns been addressed? How have they been addressed?


Photo Comment

4. Has the change been approved?


Photo Comment

5. Has the change been initiated?


Photo Comment

6. Date of Initiation


Photo Comment
Pre-Startup Safety Review

1. Is a Pre-startup Safety Review (PSSR) conducted?


Photo Comment

2. Did the PSSR expose any new, existing, or potentially existing hazards?


Photo Comment

3. Have all known new, existing, or potentially existing hazards been evaluated and mitigated?


Photo Comment

4. Has the training Program been completed or updated?


Photo Comment

5. Is a one-on-one or independent review provided?


Photo Comment

6. Is a group, presentation, or classroom setting provided?


Photo Comment

7. Is a group, hands-on learning setting provided?


Photo Comment

8. Are new job/role procedures written and approved?


Photo Comment

9. Are new tests/inspections written and approved?


Photo Comment

10. Have all affected personnel been notified and trained on the change?


Photo Comment

11. Have all affected contractors been notified and trained on the change?


Photo Comment

12. Have all Work Plans, HASPs, Procedures, Policies, MOC history page, and Documentation been updated?


Photo Comment

13. Have you updated your emergency plan, if applicable?


Photo Comment

14. Has the change review team reviewed the PSSR?


Photo Comment

15. Has the startup been approved?


Photo Comment
Post-Startup Evaluation & Change Finalization

1. Have new safety audits been conducted?


Photo Comment

2. Have gaps in safety procedures or audits been identified and addressed?


Photo Comment

3. Have all affected personnel been asked to provide feedback after the change?


Photo Comment

4. Have all gaps in training been addressed?


Photo Comment

5. Have all gaps in emergency and/or special procedures been resolved?


Photo Comment
Change Finalization

1. Has the change been fully implemented?


Photo Comment

2. Has MOC been fully documented?


Photo Comment

3. Has the change been reviewed for effectiveness?


Photo Comment

4. Was this change effective?


Photo Comment

5. Is the change accomplishing its original intent?


Photo Comment
Temporary Change Resolution

1. Has the temporary change been returned to its normal status?


Photo Comment

2. Has the temporary change been made permanent?


Photo Comment

3. Was the temporary change effective?


Photo Comment

Is this sample what you are looking for?
Sign up to use & customise this template, or create your own custom checklist:

Checklist by GoAudits.com – Please note that this checklist is intended as an example. We do not guarantee compliance with the laws applicable to your territory or industry. You should seek professional advice to determine how this checklist should be adapted to your workplace or jurisdiction.

Easy inspection app for your digital checklists