HVAC Installation Checklist
57 questions in 11 sectionsInteractive preview: try the answers
Section 1 of 11 · 6 questionsEquipment Receipt And Pre-install Verification
Equipment model, capacity, and voltage match the approved order
Equipment serial numbers are recorded for warranty registration
Units and cartons are free of shipping damage, dents, and crushed fins
All loose parts, kits, and accessories listed on the packing slip are present
The load calculation and equipment selection are documented for this property
Required permits are obtained and available on site before work begins
Section 2 of 11 · 4 questionsSite Protection And Work Area
Floor coverings and finishes along the work route are protected before material is carried in
Furniture and customer belongings are moved clear or covered
Dust containment is in place at openings into occupied areas
Tools, materials, and waste are kept clear of walkways and exits
Section 3 of 11 · 4 questionsRemoval Of Existing Equipment
Power to the existing system is isolated and locked off before removal starts
Refrigerant is recovered by a certified technician before any line is opened
The gas supply is isolated and capped where gas equipment is removed
Removal of the old equipment and its disposal are recorded
Section 4 of 11 · 5 questionsOutdoor Unit Setting
The pad, bracket, or stand is level and rated for the weight of the unit
The unit is secured against movement, wind, and accidental contact
The unit sits high enough above grade to clear standing water and snow
Clearances on all sides and above the unit meet the manufacturer's specification
Service access to the electrical compartment and service valves is unobstructed
Section 5 of 11 · 5 questionsIndoor Unit Setting
The indoor unit or air handler is level and securely fastened to its mounting
The unit is oriented for the intended airflow direction and drain fall
Filter and coil access are reachable without dismantling other installed work
A secondary drain pan is fitted where leakage would damage the building
The cabinet is sealed at the coil and blower joints with no open gaps
Section 6 of 11 · 7 questionsRefrigerant Pipework
Line set diameter and total run length match the manufacturer's specification
Lines are supported at the required intervals with no kinks or flattening
Nitrogen is purged through the lines during all brazing
The system holds a pressure test at the specified value with no loss
The system is evacuated to the manufacturer's micron target before charging
Suction line insulation is continuous with sealed joints and no gaps at the wall
Refrigerant charge is weighed in and the quantity is recorded
Section 7 of 11 · 6 questionsCondensate Management
The drain line is trapped as required for the equipment and installation type
The drain line has continuous fall from the pan to the discharge point
A float switch or overflow cutout is fitted where leakage would damage the building
Drain lines in unconditioned space are insulated against condensation
The discharge point is approved and does not run onto a walkway or into a habitable space
The drain line is tested with water and flows freely with no leaks at the joints
Section 8 of 11 · 5 questionsDuctwork Connections And Insulation
Supply and return connections at the unit are mechanically fastened and sealed
Transitions and plenums are sealed with no open seams at the cabinet
Flexible duct is fully extended with no kinks, sags, or compressed bends
Duct supports are spaced to prevent sagging along the full run
Duct insulation is continuous with the vapor barrier sealed at all joints
Section 9 of 11 · 5 questionsGas Piping And Venting
Gas pipe size matches the appliance input rating and the total run length
A sediment trap and an accessible manual shutoff are fitted at the appliance
All gas joints are leak tested and the test result is recorded
The vent terminal position meets clearance requirements for openings and boundaries
Combustion air provision meets the appliance requirement for the space
Section 10 of 11 · 5 questionsElectrical Connections
A disconnect is fitted within sight of the unit and is accessible
Breaker rating and conductor size match the equipment nameplate requirement
Equipment grounding and bonding are connected and continuous
The whip, conduit, and wall penetrations are secured and sealed against air and pest entry
Control and thermostat wiring is terminated correctly with no exposed conductors
Section 11 of 11 · 5 questionsHandover And Documentation
Manufacturer manuals and warranty registration are left with the customer or facility
The thermostat or controller is set up and the customer is shown how to operate it
Filter size, location, and replacement interval are explained and recorded
The work area is cleaned and all packaging and old equipment are removed from site
Outstanding items are listed and a return date is agreed
Checklist by GoAudits. This checklist is an example: we do not guarantee compliance with the laws applicable to your territory or industry. Seek professional advice to adapt it to your workplace or jurisdiction.
Free PDF
Download the HVAC Installation Checklist
By downloading this checklist you agree to the GoAudits privacy policy and terms of service.
NEW! Try generating a custom checklist with our free AI tool:
Easy inspection app for your digital checklists
- Conduct inspections anytime, anywhere - even offline
- Capture photos as proof of compliance or areas needing attention
- Instantly generate and share detailed reports after the inspections
- Assign & track follow-up tasks, view historical trends on a centralized dashboard