Exhaust Fan Maintenance Checklist

Utilize this Exhaust Fan Maintenance Checklist for routine inspection of motors, bearings, belts, ductwork, dampers, and measured airflow performance.

Exhaust Fan Maintenance Checklist



Fan And System Details

1. Fan asset ID or tag number


Photo Comment

2. Area or zone served by the fan


Photo Comment

3. Make and model


Photo Comment

4. Fan type (axial, centrifugal, in-line, roof-mounted)


Photo Comment

5. Design airflow and static pressure from the equipment schedule


Photo Comment
Isolation And Safety Preparation

1. The fan is isolated at the local isolator following lockout/tagout procedure


Photo Comment

2. Zero energy is verified at the motor terminals before any physical inspection


Photo Comment

3. Isolation tags are displayed and the impeller has come to a complete stop


Photo Comment

4. All guards and access panels are refitted and secured before the fan is restarted


Photo Comment
Motor And Electrical Connections

1. Motor surface temperature is within the manufacturer's stated limit


Photo Comment

2. Measured amp draw on each phase is within the motor nameplate rating


Photo Comment

3. The motor nameplate is present and legible


Photo Comment

4. Terminal box connections are tight and free from discoloration or scorching


Photo Comment

5. Earth continuity to the fan and motor is confirmed


Photo Comment

6. The local isolator is labeled, accessible, and operates correctly


Photo Comment

7. Cable glands and flexible conduit are intact and correctly sealed


Photo Comment
Bearings, Belts And Drive

1. Bearings run without grinding, rumbling, or knocking


Photo Comment

2. Bearing shaft play is within the manufacturer's tolerance


Photo Comment

3. Bearings are lubricated per the service schedule with no grease leakage


Photo Comment

4. Drive belts are free from cracking, glazing, and fraying


Photo Comment

5. Belt tension matches the manufacturer's specification


Photo Comment

6. Drive and driven pulleys are aligned with no visible wear on the sheave faces


Photo Comment
Impeller, Housing And Mountings

1. Impeller blades are undamaged and free from cracks or distortion


Photo Comment

2. Blades are free from dust, grease, or debris buildup that would cause imbalance


Photo Comment

3. The fan housing is free from corrosion, dents, and perforation


Photo Comment

4. Housing and mounting fasteners are tight


Photo Comment

5. Anti-vibration mounts and springs are intact with no deterioration or fatigue


Photo Comment

6. Measured vibration at the bearing housings is within the acceptable range


Photo Comment
Ductwork, Dampers And Discharge

1. Flexible duct connections are intact with no tears or splits


Photo Comment

2. Rigid ductwork joints are sealed with no visible air leakage


Photo Comment

3. Ductwork is free from corrosion, dents, and internal blockage


Photo Comment

4. Duct access and inspection panels are secured and sealed


Photo Comment

5. Volume control dampers move freely and are set to the commissioned position


Photo Comment

6. Backdraft or non-return dampers close fully when the fan stops


Photo Comment

7. The discharge point is unobstructed and positioned to prevent air re-entering intakes


Photo Comment
Filters And Cleanliness

1. Filters are fitted correctly with no bypass around the frames


Photo Comment

2. Filter media is free from clogging, saturation, and physical damage


Photo Comment

3. Differential pressure across the filters is within the operating range


Photo Comment

4. Condensate drains and drip trays are clear and draining freely


Photo Comment
Performance And Controls Verification

1. The fan starts on demand and runs at each available speed setting


Photo Comment

2. Impeller rotation direction matches the arrow on the housing


Photo Comment

3. Measured airflow at the grille or duct is within the design specification


Photo Comment

4. Static pressure reading is within the expected range for the system


Photo Comment

5. Interlocks with the fire alarm or building management system operate correctly


Photo Comment

6. Run indication, fault alarms, and airflow sensors report accurately at the control panel


Photo Comment
Maintenance Records And Follow-up

1. The planned maintenance log for this fan is complete and up to date


Photo Comment

2. Defects raised at the previous inspection have been closed out


Photo Comment

3. Servicing intervals follow the manufacturer's recommended schedule


Photo Comment

4. Cleaning and testing certificates required for this fan type are on file and in date


Photo Comment

Checklist by GoAudits.com – Please note that this checklist is intended as an example. We do not guarantee compliance with the laws applicable to your territory or industry. You should seek professional advice to determine how this checklist should be adapted to your workplace or jurisdiction.

Is this sample what you are looking for?
Sign up to use & customize this template, or create your own custom checklist.

NEW! Try generating a custom checklist with our free AI tool:

Easy inspection app for your digital checklists