Equipment Validation Template

Use this Equipment Validation Template to confirm that machinery and tools meet all operational requirements, ensuring accuracy, safety, and compliance.

Equipment Validation Template



General Information

1. Equipment name, model, and unique ID/serial number:


Photo Comment

2. Location:


Photo Comment

3. Purpose or Intended use of the equipment:


Photo Comment

4. Who are the responsible personnel (owner, operator, QA, maintenance)?


Photo Comment

5. Validation protocol or reference document number:


Photo Comment
Documentation & Specifications

1. Is the user requirement specification (URS) available and approved?


Photo Comment

2. Is the equipment specification and vendor manual documented?


Photo Comment

3. Have the design qualification (DQ) documents been reviewed and approved?


Photo Comment

4. Are calibration certificates for instruments and gauges available?


Photo Comment

5. Are material certificates and compliance reports attached?


Photo Comment
Installation Qualification (IQ)

1. Has the equipment been installed as per the manufacturer’s requirements?


Photo Comment

2. Are all utilities (power, water, gas, compressed air, etc.) correctly connected?


Photo Comment

3. Are safety features, guards, and emergency stops in place?


Photo Comment

4. Is the equipment identification plate legible and accurate?


Photo Comment

5. Has the installation been verified against layout drawings?


Photo Comment
Operational Qualification (OQ)

1. Were functional checks performed as per operating procedures?


Photo Comment

2. Does the equipment respond correctly to control inputs?


Photo Comment

3. Are operating ranges (temperature, speed, pressure, etc.) within limits?


Photo Comment

4. Are alarms, sensors, and interlocks working correctly?


Photo Comment

5. Has repeatability and consistency been demonstrated under test runs?


Photo Comment
Performance Qualification (PQ)

1. Does the equipment perform as intended under real operating conditions?


Photo Comment

2. Were trial runs performed using actual materials/products?


Photo Comment

3. Were critical process parameters maintained within specification?


Photo Comment

4. Did output quality meet pre-defined acceptance criteria?


Photo Comment

5. Was performance monitored over a defined period to confirm reliability?


Photo Comment
Cleaning, Maintenance & Safety

1. Are cleaning and sanitation procedures validated and documented?


Photo Comment

2. Are preventive maintenance schedules in place and verified?


Photo Comment

3. Are operator safety instructions clear and implemented?


Photo Comment

4. Are lockout/tagout procedures available where applicable?


Photo Comment

5. Has risk assessment been performed and documented?


Photo Comment
Deviations & Corrective Actions

1. Were any deviations recorded during validation activities?


Photo Comment

2. Were corrective actions implemented and documented?


Photo Comment

3. Were re-tests conducted if required?


Photo Comment

4. Were all deviations closed before final approval?


Photo Comment

5. Is a summary of deviations included in the final report?


Photo Comment
Final Approval & Sign-Off

1. Has the validation summary report been prepared?


Photo Comment

2. Has QA reviewed and approved the validation results?


Photo Comment

3. Have all responsible parties (engineering, QA, operations) signed off?


Photo Comment

4. Is the equipment released for routine use?


Photo Comment

5. Are validation records stored in compliance with regulatory requirements?


Photo Comment

Is this sample what you are looking for?
Sign up to use & customise this template, or create your own custom checklist:

Checklist by GoAudits.com – Please note that this checklist is intended as an example. We do not guarantee compliance with the laws applicable to your territory or industry. You should seek professional advice to determine how this checklist should be adapted to your workplace or jurisdiction.

Easy inspection app for your digital checklists