Electrical Near Miss Report

Use this Electrical Near Miss Report to document electrical hazards, unsafe conditions, and close calls, enabling teams to investigate causes and prevent future electrical accidents.

Electrical Near Miss Report



57 questions in 9 sectionsInteractive preview: try the answers

Section 1 of 9 · 6 questions

Report Details

  1. Report reference number

  2. Date and time the near miss occurred

  3. Date the near miss was reported

  4. Reporter name and role

  5. Report submitted anonymously

  6. Company or trade of the person reporting

Section 2 of 9 · 7 questions

Location And Task

  1. Site or location

  2. Equipment or system involved (switchboard, panel, MCC, distribution board, overhead line, or other)

  3. Voltage level (low voltage or high voltage)

  4. Task being carried out at the time

  5. Permit to work in place

  6. Permit to work reference number

  7. Isolation or lockout/tagout in place at the time

Section 3 of 9 · 10 questions

Electrical Near Miss Category

  1. Contact or near-contact with live or energized parts

  2. Arc flash or arc blast

  3. Electric shock without injury

  4. Isolation or lockout/tagout failure

  5. Unexpected re-energization or backfeed

  6. Buried or overhead cable or services strike

  7. Damaged cable, equipment, or insulation

  8. Work on an assumed-dead circuit

  9. Static discharge

  10. Other (specify)

Section 4 of 9 · 5 questions

Description Of The Near Miss

  1. Description of what happened, in sequence

  2. Who was involved or exposed

  3. What the person was doing at the moment it occurred

  4. What could have happened (potential outcome)

  5. Any equipment, conditions, or documentation that contributed

Section 5 of 9 · 4 questions

Potential Severity And Likelihood

  1. Potential worst-case outcome (shock, burn, arc flash injury, or fatality)

  2. Likelihood of recurrence if no action is taken

  3. High-potential near miss

  4. Overall risk rating

Section 6 of 9 · 6 questions

Immediate Actions Taken

  1. Equipment isolated or de-energized

  2. Area made safe or access restricted

  3. Permit to work suspended

  4. Work stopped

  5. Persons in the area warned or informed

  6. Supervisor or duty holder notified

Section 7 of 9 · 8 questions

Contributing Factors And Root Cause

  1. Inadequate or incomplete isolation

  2. Mislabelled or unlabelled equipment

  3. Incorrect, missing, or out-of-date documentation

  4. Competency or training gap

  5. Personal protective equipment not worn or inadequate

  6. Unfamiliarity with the site or equipment

  7. Time pressure or workload

  8. Underlying or root cause of the near miss

Section 8 of 9 · 6 questions

Corrective And Preventive Actions

  1. Recommended corrective actions

  2. Action owner

  3. Target completion date

  4. Action status (open, in progress, or closed)

  5. Isolation procedure or arc flash assessment reviewed

  6. Toolbox talk or briefing required

Section 9 of 9 · 5 questions

Sign-off And Distribution

  1. Reported to (name and role)

  2. Investigated by (name and role)

  3. Date the report was closed out

  4. Photographs or evidence attached

  5. Report distributed to (names or roles)

Checklist by GoAudits. This checklist is an example: we do not guarantee compliance with the laws applicable to your territory or industry. Seek professional advice to adapt it to your workplace or jurisdiction.

Free PDF

Download the Electrical Near Miss Report

By downloading this checklist you agree to the GoAudits privacy policy and terms of service.

NEW! Try generating a custom checklist with our free AI tool:

Easy inspection app for your digital checklists