- Library
- Property Inspection
- Commissioning Checklist - Appliances
Commissioning Checklist - Appliances
73 questions in 13 sectionsInteractive preview: try the answers
Section 1 of 13 · 6 questionsPre-Installation And Delivery Checks
Appliance model and serial number match the purchase order
Appliance carries a compliance or energy rating label as required for sale in New Zealand
No transit damage is visible to the cabinet, door, glass or controls
All accessories, hoses, brackets and manuals supplied with the unit are present
The installation location meets the manufacturer's stated clearances
Floor is level and able to support the loaded weight of the appliance
Section 2 of 13 · 8 questionsElectrical Connection And Certification
Plug-in appliances connect to a dedicated socket outlet without adaptors or piggyback plugs
The circuit supplying the appliance has RCD protection
Hard-wired appliances were connected by an electrical worker licensed by the EWRB
A Certificate of Compliance has been issued for general or high-risk prescribed electrical work
A Record of Inspection has been issued for any high-risk prescribed electrical work
An Electrical Safety Certificate has been issued where the installation is newly connected to supply
The isolating switch or socket for each appliance is accessible after installation
Supply cord is not pinched, stretched or run against a hot surface
Section 3 of 13 · 8 questionsGas Connection And Certification
Gasfitting was carried out by a certifying gasfitter registered with the PGDB
A Gas Safety Certificate has been issued for the gasfitting work
A Certificate of Compliance has been issued for general or high-risk gasfitting work
The Certificate of Compliance states the cited version of AS/NZS 5601.1 including amendments
A single version of AS/NZS 5601.1 was applied across the whole installation
The gas appliance carries a compliance label showing certification for sale in New Zealand
Any flexible hose assembly is certified to AS/NZS 1869 Class B or Class D
A leak test was completed and recorded before the appliance was commissioned
Section 4 of 13 · 5 questionsWater Supply And Drainage
Inlet hoses are new, correctly rated and tightened without cross-threading
Isolating taps are fitted and accessible for each water connection
Drain hose is secured at the height stated in the installation instructions
Drain hose is not kinked and the standpipe is not sealed airtight
No leaks are present at any connection after a full cycle under pressure
Section 5 of 13 · 4 questionsVentilation And Clearances
Minimum clearances to walls, cabinetry and adjacent appliances are met
Ventilation openings and condenser airflow paths are unobstructed
Ducted extraction discharges to outside air rather than recirculating into the room
Ducting is the diameter specified by the manufacturer with minimal bends
Section 6 of 13 · 6 questionsWashing Machine
Transit bolts or shipping brackets have been removed and retained
The unit is levelled on all feet and the locking nuts are tightened
A full test cycle has been run with no leaks at inlet or drain
The machine does not move or walk during the spin cycle
Hot and cold inlets are connected to the correct supplies
Drum is free of packaging, tape and residue
Section 7 of 13 · 5 questionsDryer
Vented dryers discharge to outside air, not into the room or roof space
Lint filter is fitted and seats correctly
Condensate container or drain connection is fitted for condenser models
A full drying cycle has been run and the unit heats and tumbles correctly
Reversible door hinges are correctly refitted and the door latches
Section 8 of 13 · 4 questionsRefrigerator
The unit has stood upright for the period stated before being switched on
Doors seal evenly with no gaps and self-close where designed to
Cabinet temperature reaches the manufacturer's stated range within the expected time
Water and ice connections, where fitted, run clear with no leaks
Section 9 of 13 · 5 questionsDishwasher
The unit is secured to the benchtop or cabinetry to prevent tipping
Inlet and drain connections are leak free after a full cycle
Spray arms rotate freely and the filter is fitted
A test cycle completes and the unit heats to the programmed temperature
Door springs are adjusted so the door holds at any position
Section 10 of 13 · 3 questionsMicrowave
The unit is installed at the height and clearance stated by the manufacturer
Built-in units have the trim kit and ventilation gaps specified
The door interlock stops operation when the door is opened
Section 11 of 13 · 6 questionsRangehood
Clearance above gas burners meets the current AS/NZS 5601 minimum of 650 mm
Mounting height also satisfies the manufacturer's stated minimum for the cooktop
Filters are fitted and removable for cleaning
All fan speeds and lights operate
Airflow is confirmed at the external discharge point
Ducting joints are sealed and supported
Section 12 of 13 · 7 questionsCooktop
The cooktop is secured to the benchtop with the supplied clamps or brackets
Benchtop cut-out matches the template and cut edges are sealed
The appliance gas type setting matches the gas supplied, natural gas or LPG
All elements or burners ignite and modulate across the full control range
Gas burners show a stable blue flame with no lifting or yellow tipping
Flame failure devices, where fitted, shut off gas when the flame is extinguished
Clearances to adjacent combustible surfaces meet the installation instructions
Section 13 of 13 · 6 questionsDocumentation And Handover
Model and serial numbers are recorded against the unit and its location
Warranty registration has been completed
All certificates are filed against the property or asset record
Manuals and operating instructions have been handed to the occupant or facilities team
The user has been shown basic operation and the isolation points
Any defects found are logged with a responsible party and a due date
Checklist by GoAudits. This checklist is an example: we do not guarantee compliance with the laws applicable to your territory or industry. Seek professional advice to adapt it to your workplace or jurisdiction.
Free PDF
Download the Commissioning Checklist - Appliances
By downloading this checklist you agree to the GoAudits privacy policy and terms of service.
NEW! Try generating a custom checklist with our free AI tool:
Easy inspection app for your digital checklists
- Conduct inspections anytime, anywhere - even offline
- Capture photos as proof of compliance or areas needing attention
- Instantly generate and share detailed reports after the inspections
- Assign & track follow-up tasks, view historical trends on a centralized dashboard