Chiller Commissioning Checklist

Utilize this Chiller Commissioning Checklist to systematically verify the proper functioning before and after the start up of a chiller system.

Chiller Commissioning Checklist



41 questions in 3 sectionsInteractive preview: try the answers

Section 1 of 3 · 14 questions

Before Start-up

  1. Have all the technicians and operators read and understood all manuals?

  2. Have all the technicians and operators read and understood all manuals for third party components?

  3. Has the unit installation and vibration damper adjustment been checked?

  4. Has functional testing of safety equipment been carried out?

  5. Are the opening pressures on all safety valves, correct?

  6. Has vacuum test been carried out?

  7. Have oil levels been checked?

  8. Has the heating element in the oil been on for 6-8 hours before start-up?

  9. Has a sample of the primary refrigerant been taken and checked to ensure it is free from water, air, etc.?

  10. Is the motor rotation direction correct?

  11. Is the coupling aligned?

  12. Is the compressor cooling connected correctly?

  13. Are there any leaks in the plant?

  14. Are valves in the correct position for operation?

Section 2 of 3 · 5 questions

After Start-up

  1. Is the capacity regulation system working correctly?

  2. Has the refrigerant charge (at full load) been checked?

  3. Has the unit been checked for vibrations?

  4. Has the unit been checked for vibrations using variable speed?

  5. Has a lubricating oil sample been collected after about 1 hour of operation and saved?

Section 3 of 3 · 22 questions

Observations

  1. Operation time (hours)

  2. Suction pressure (°C/R)

  3. Suction temperature (°C)

  4. Superheating, suction gas (K)

  5. Discharge pressure (°C/R)

  6. Discharge temperature (°C)

  7. Oil pressure, compressor (bar)

  8. Oil pressure, filter (bar)

  9. Oil temperature (°C)

  10. Oil temperature, separator (°C)

  11. Oil collection from shaft seal (ml)

  12. Oil level (0, 1/4, 1/2, 3/4, Full)

  13. Charged oil (Litre)

  14. Motor 1/1 load (amp.)

  15. Capacity load (%)

  16. Noise level

  17. Pass,Fail ~ Radio

  18. Vibrations (0-100% capacity)

  19. Pass,Fail ~ Radio

  20. Brine temperature, outlet - Evaporator (°C)

  21. Brine temperature, outlet - Condenser (°C)

  22. Refrigerant charge (Kg)

Checklist by GoAudits. This checklist is an example: we do not guarantee compliance with the laws applicable to your territory or industry. Seek professional advice to adapt it to your workplace or jurisdiction.

Free PDF

Download the Chiller Commissioning Checklist

By downloading this checklist you agree to the GoAudits privacy policy and terms of service.

NEW! Try generating a custom checklist with our free AI tool:

Easy inspection app for your digital checklists