- Library
- Facility & Services
- Boiler Commissioning Checklist
Boiler Commissioning Checklist
40 questions in 8 sectionsInteractive preview: try the answers
Section 1 of 8 · 9 questionsGeneral Inspection
What is the customer's name:
What is the telephone Number
What is the address:
What is the Boiler Make and Model:
What is the Boiler Serial Number:
Who is it Commissioned by:
What is the Gas Safe Register Number:
What is the Company Name:
What is the Company Address:
Section 2 of 8 · 10 questionsControls
What is the time and temperature control for heating:
Time and temperature control to hot water:
Are heating zone valves fitted?
Are hot water zone valves fitted?
Are thermostatic radiator valves fitted?
Is the automatic bypass to the system fitted?
Is the boiler interlock provided?
What is the programmable room thermostat temperature?
What is the optimum start control?
Is the combination boiler fitted?
Section 3 of 8 · 4 questionsAll Systems
Have the systems been flushed and cleaned in accordance with BS7593 and the boiler manufacturer's instructions?
What system cleaner was used?
What inhibitor was used?
Has a primary water system filter been installed?
Section 4 of 8 · 4 questionsCentral Heating Mode
What is the Gas rate?
What is the Burner operating pressure?
What is the Central heating flow temperature?
What is the Central heating return temperature?
Section 5 of 8 · 3 questionsCombination Boilers
Is the installation in a hard water area (above 200 ppm)?
If yes, and if required by the manufacturer, has a water scale reducer been fitted?
What type of scale reducer has been fitted?
Section 6 of 8 · 5 questionsDomestic Hot Water Mode
What is the Gas rate?
What is the burner operating pressure (at maximum rate)?
What is the cold water inlet temperature?
Has hot water been checked at all outlets?
What is the water flow rate
Section 7 of 8 · 1 questionCondensing Boilers
Has the condensate drain been installed in accordance with the manufacturer's instructions and/or BS5546/BS6798?
Section 8 of 8 · 4 questionsAll Installations
Does the heating and hot water system comply with the appropriate building regulations?
Have the boiler and associated products been installed and commissioned in accordance with the manufacturer's instructions?
Is the operation of the boiler and system controls demonstrated to and understood by the customer?
Is the manufacturer's literature, including the benchmark checklist and service record, explained and left with the customer?
Checklist by GoAudits. This checklist is an example: we do not guarantee compliance with the laws applicable to your territory or industry. Seek professional advice to adapt it to your workplace or jurisdiction.
Free PDF
Download the Boiler Commissioning Checklist
By downloading this checklist you agree to the GoAudits privacy policy and terms of service.
NEW! Try generating a custom checklist with our free AI tool:
Easy inspection app for your digital checklists
- Conduct inspections anytime, anywhere - even offline
- Capture photos as proof of compliance or areas needing attention
- Instantly generate and share detailed reports after the inspections
- Assign & track follow-up tasks, view historical trends on a centralized dashboard