Waterproofing Quality Control Checklist
30 questions in 6 sectionsInteractive preview: try the answers
Section 1 of 6 · 5 questionsPre-Application Preparation
Has the surface been cleaned of dust, oil, debris, and contaminants?
Is the substrate dry and moisture-free as per the manufacturer’s specifications?
Are all cracks, joints, and voids properly repaired before application?
Have protection boards or surface primers been applied where specified?
Is the ambient temperature within the acceptable application range?
Section 2 of 6 · 5 questionsMaterial Verification
Are all waterproofing materials approved and within the expiration date?
Are materials stored in dry, shaded, and temperature-controlled conditions?
Do material batch numbers and data sheets match the project submittals?
Are manufacturers' installation guidelines available on-site?
Have protective coatings or sealants passed incoming inspection or test sampling?
Section 3 of 6 · 5 questionsApplication Process
Is the application method (spray, roll, torch, sheet membrane, etc.) appropriate for the surface?
Are trained personnel performing the waterproofing installation?
Is the first coat or membrane applied at the correct thickness and coverage rate?
Is curing time between layers respected as per the manufacturer’s instructions?
Are overlaps and seams properly sealed and tested for continuity?
Section 4 of 6 · 5 questionsQuality Control & Testing
Is wet film thickness or dry film thickness measured and recorded regularly?
Is adhesion tested at random points to verify bonding to the substrate?
Is a flood or ponding test conducted to check for leaks in critical areas?
Are electronic leak detection or vacuum tests performed where required?
Are inspection points marked, logged, and photographed?
Section 5 of 6 · 5 questionsDetailing And Penetrations
Are all joints, corners, and transitions treated with reinforcing fabric or flexible tape?
Are pipe penetrations, drains, and embedded items fully sealed with compatible materials?
Are upturns and vertical terminations completed to the correct height and securely bonded?
Are flashing details, edge seals, and expansion joints properly integrated with the system?
Is the termination of the membrane properly protected from mechanical damage?
Section 6 of 6 · 5 questionsPost-Installation Protection
Has the waterproofed area been protected from foot traffic or construction debris?
Are protective boards, screeds, or drainage mats installed where required?
Is the waterproofing membrane labeled or documented for future maintenance?
Are any breaches in the membrane repaired and re-tested before handover?
Is a final inspection conducted with photographic evidence for quality assurance?
Checklist by GoAudits. This checklist is an example: we do not guarantee compliance with the laws applicable to your territory or industry. Seek professional advice to adapt it to your workplace or jurisdiction.
Free PDF
Download the Waterproofing Quality Control Checklist
By downloading this checklist you agree to the GoAudits privacy policy and terms of service.
NEW! Try generating a custom checklist with our free AI tool:
Easy inspection app for your digital checklists
- Conduct inspections anytime, anywhere - even offline
- Capture photos as proof of compliance or areas needing attention
- Instantly generate and share detailed reports after the inspections
- Assign & track follow-up tasks, view historical trends on a centralized dashboard