- Library ›
- Transport & Automotive ›
- Trailer PDI Checklist
Trailer PDI Checklist
72 questions in 11 sectionsInteractive preview: try the answers
Section 1 of 11 · 7 questionsDocumentation And Identity
The invoice matches the agreed model, floor plan, options, and price
The VIN on the unit matches the title and registration paperwork
The weight rating plate showing GVWR and axle ratings is present and legible
Owner's manuals for the unit and all appliances are supplied
Warranty terms and registration for the unit and components are documented
The tire and loading information label is present and correct
All ordered options and upgrades are fitted and accounted for
Section 2 of 11 · 8 questionsExterior Body And Slide-Outs
The siding is free of dents, bubbles, delamination, or color variation
Exterior seams and trim are sealed, straight, and securely fastened
Decals and graphics are aligned with no bubbles or lifting edges
Storage compartment doors open, close, latch, and seal correctly
Entry doors and the screen door align, latch, and lock properly
Slide-outs extend and retract smoothly and seal fully when closed
The awning extends, retracts, and locks without binding or tears
Exterior steps deploy and retract and are secure underfoot
Section 3 of 11 · 5 questionsRoof And Seals
The roof membrane is intact with no tears, bubbles, or punctures
Sealant around vents, antennas, and fixtures is complete and uncracked
Roof-mounted air conditioner shrouds are intact and secure
Vents and skylights open, close, and seal correctly
Gutters and drip rails direct water away from the seams
Section 4 of 11 · 8 questionsRunning Gear And Towing
Tires are new, correctly sized, and inflated to the rated pressure
Lug nuts are torqued to specification on every wheel
Wheel bearings are packed and hubs show no play or overheating
The spare tire, carrier, and jack are present and serviceable
Trailer brakes engage and release correctly with the controller
The coupler matches the hitch and locks securely to the ball
Safety chains and the breakaway cable and switch are fitted and working
The leveling jacks and stabilizers operate smoothly and hold
Section 5 of 11 · 7 questionsElectrical System
The 12V battery is charged, secured, and the correct type
Shore power connects and the system powers up on 110V
The converter or inverter charges and supplies power correctly
GFCI outlets trip and reset correctly when tested
All interior and exterior lights operate
All 110V outlets are wired correctly and functional
The breaker panel and fuses are labeled and operational
Section 6 of 11 · 8 questionsWater And Plumbing
The fresh water tank fills and the pump builds pressure without leaks
The city water inlet supplies the system without leaks at fittings
Hot and cold water flow at every faucet and the shower
The water heater operates and produces hot water
The toilet flushes and seals without leaking
Gray and black tank valves operate smoothly and seal closed
Tank level indicators read correctly
No leaks are visible under sinks, fittings, or tanks
Section 7 of 11 · 5 questionsLP And Propane System
Propane cylinders are secured and within their certification date
The regulator switches correctly between cylinders
A leak test has been completed on the propane system
The propane leak detector is fitted and functions
Each gas appliance lights and runs on propane
Section 8 of 11 · 7 questionsAppliances
The air conditioner cools and cycles correctly on each setting
The furnace ignites and heats with even airflow from the vents
The refrigerator cools on both power sources
The microwave heats and the turntable operates
The cooktop burners and oven light and heat correctly
The range hood fan and light operate
The water heater operates on both gas and electric where fitted
Section 9 of 11 · 7 questionsInterior And Cabinetry
Cabinet doors and drawers open, close, and latch securely
Countertops and surfaces are free of chips, scratches, or damage
Flooring is laid flat with no gaps, bubbles, or soft spots
Windows open, close, lock, and seal with intact screens
Interior slide rooms operate without rubbing or gaps when closed
Furniture, beds, and dinettes are secure and convert correctly
Blinds, shades, and window treatments operate correctly
Section 10 of 11 · 5 questionsSafety Equipment
The smoke detector is fitted and sounds when tested
The carbon monoxide detector is fitted and functions
The fire extinguisher is present, charged, and accessible
The emergency exit window opens and releases correctly
First aid and emergency information are present where required
Section 11 of 11 · 5 questionsHandover And Acceptance
The dealer demonstrates the operation of each major system
A walkthrough covers winterizing, dumping, and towing procedures
All identified defects are recorded on a punch list
Outstanding repairs are agreed before acceptance paperwork is signed
The unit is clean and presented ready for delivery
Checklist by GoAudits. This checklist is an example: we do not guarantee compliance with the laws applicable to your territory or industry. Seek professional advice to adapt it to your workplace or jurisdiction.
Free PDF
Download the Trailer PDI Checklist
By downloading this checklist you agree to the GoAudits privacy policy and terms of service.
NEW! Try generating a custom checklist with our free AI tool:
Easy inspection app for your digital checklists
- Conduct inspections anytime, anywhere - even offline
- Capture photos as proof of compliance or areas needing attention
- Instantly generate and share detailed reports after the inspections
- Assign & track follow-up tasks, view historical trends on a centralized dashboard