Reefer Trailer Inspection Checklist

Use the Reefer Trailer Inspection Checklist for warehouse and DC teams to check pre-cooling, setpoint, seals, and product temperatures at the dock.

Reefer Trailer Inspection Checklist



25 questions in 5 sectionsInteractive preview: try the answers

Section 1 of 5 · 5 questions

Trailer Condition Before Loading

  1. Trailer interior is clean, dry, and free of odors and residue

  2. Floor drains are clear and floor channels are free of debris

  3. Door seals and gaskets are intact, with no gaps when closed

  4. Walls, ceiling, and insulation are free of holes and damage

  5. Air chute is intact and attached along the full trailer length

Section 2 of 5 · 5 questions

Refrigeration Unit Before Loading

  1. Trailer is pre-cooled to the setpoint before loading starts

  2. Setpoint on the unit matches the temperature on the order

  3. Unit mode (continuous or cycle) matches the product requirement

  4. Refrigeration unit shows no active alarms

  5. Refrigeration unit has enough fuel for the planned trip

Section 3 of 5 · 6 questions

Loading

  1. Product temperatures are within specification before loading

  2. Trailer is loaded through a sealed dock door to limit warm air entry

  3. Pallets are kept clear of the front bulkhead and return air opening

  4. Airflow space is left above the load and along the walls

  5. Temperature recorder is started and placed in the load

  6. Seal is applied and its number is recorded on the bill of lading

Section 4 of 5 · 4 questions

Arrival Checks

  1. Seal is intact and its number matches the bill of lading

  2. Refrigeration unit is running when the trailer arrives

  3. Unit display temperature is within range of the setpoint

  4. Temperature recorder data is downloaded and shows no excursions in transit

Section 5 of 5 · 5 questions

Product Condition And Acceptance

  1. Product core temperatures recorded at the front, middle, and rear of the load

  2. Product temperatures are within the acceptance limits in the specification

  3. No thawed, refrozen, wet, or frosted packaging is found

  4. Pallets have not shifted or blocked airflow during transit

  5. Accept, reject, or hold decision follows the documented acceptance criteria

Checklist by GoAudits. This checklist is an example: we do not guarantee compliance with the laws applicable to your territory or industry. Seek professional advice to adapt it to your workplace or jurisdiction.

Free PDF

Download the Reefer Trailer Inspection Checklist

By downloading this checklist you agree to the GoAudits privacy policy and terms of service.

NEW! Try generating a custom checklist with our free AI tool:

Easy inspection app for your digital checklists