Project Commissioning Checklist

Utilize this Project Commissioning Checklist to ensure success factors and valuable elements are monitored before handover to meet required standards.

Project Commissioning Checklist



17 questions in 2 sectionsInteractive preview: try the answers

Section 1 of 2 · 7 questions

Valuable Elements

  1. Has the owner been assisted in evaluating the facility's requirements regarding energy conservation, indoor environment, staff training, and operation and maintenance prior to the design phase?

  2. Are all phases of design and construction documents reviewed for compliance with design criteria, commissioning requirements, bidding issues, construction coordination, installation concerns, performance aspects, and facilitation of operations and maintenance, including training and documentation?

  3. Have the equipment submittals been reviewed for compliance with commissioning requirements?

  4. Are the scheduling and the procedures used for system start-up verified or managed?

  5. Is it verified that the training for the owner’s operating staff is conducted in accordance with the project documents?

  6. Have the operations and maintenance manuals been verified to comply with the contract documents?

  7. Is the owner assisted in assessing the systems’ performance and addressing related issues prior to the expiration of the construction contract warranty?

Section 2 of 2 · 10 questions

Success Factors

  1. s a backcheck performed during the system selection and concept phase?

  2. Are the Design Development (DD) Documents referred to, including a backcheck of system selection and concept comments?

  3. Are the Mid-Construction Documents (CD) referred to, including a backcheck of DD review comments?

  4. Is it assured that the Owner’s Project Requirements (OPR) and Basis of Design (BOD) are being followed?

  5. Are the specific requirements described in the Owner’s Project Requirements (OPR) addressed and verified?

  6. Is it ensured that the unique project circumstances are not overlooked?

  7. Is the contractor assisted in completing the project correctly the first time, improving the efficiency of the construction and commissioning process?

  8. Is it assured that systems and equipment are maintainable, can be commissioned, and are ready for functional testing?

  9. Is the owner made aware of and supportive of the benefits and process, with sufficient field observations included in the commissioning scope of work?

  10. Does the entire team have a proper understanding of the scope of services, benefits, and schedule implications?

Checklist by GoAudits. This checklist is an example: we do not guarantee compliance with the laws applicable to your territory or industry. Seek professional advice to adapt it to your workplace or jurisdiction.

Free PDF

Download the Project Commissioning Checklist