Plant Commissioning Checklist
31 questions in 4 sectionsInteractive preview: try the answers
Section 1 of 4 · 3 questionsPumping Systems
Choose the large pump from the following: Influent Pumps Wet Weather Pumps Mixed Liquor Pumps Effluent Pumps
Choose the small pump from the following: Grit Pump RAS/WAS/Pump Recycle Pump, Non-potable Water Pump, Unthicken Sludge Pump Groundwater Pumps
Choose the comminutors and screening equipment from the following: Comminutors Influent Screens Screenings Dewatering Equipment Screening Conveyor
Section 2 of 4 · 13 questionsPreliminary Treatment Process Equipment
Has representative equipment and motor performance test data been received?
Have the final approved shop drawings been received?
Has the final approved O&M manual been received?
Has the manufacturer inspected the installation?
Has a manufacturer startup occurred?
Has the manufacturer O&M training occurred?
Is the equipment covered by a new or existing online training module?
Has the functionality of the manufacturer control system been demonstrated?
Has the vendor control panel/facility SCADA system interface been successfully demonstrated?
Have spare parts been received and turned over to the Treatment Division?
Have electrical and control checks been completed?
Has the warranty been received?
Choose the equipment from the following:
Section 3 of 4 · 3 questionsSecondary Treatment Process Equipment
Choose the secondary treatment equipment from the following: Aeration Blowers Diffuser System Clarifier Collector Mechanism Scum Collection Equipment
Choose the disinfection equipment from the following: UV Equipment System HOCI Storage HOCL/Pump/meter Equipment, HOCL Injection Mixing Equipment Dechlor Storage, Dechlor Pump/meter Equipment Other
Choose the filtration equipment from the following: Underdrains and Troughs Sweeps or Air Grids Media, Air Wash Compressor, Disk Filters Other
Section 4 of 4 · 12 questionsTertiary Treatment Process Equipment
Has the representative equipment and motor performance test data been received?
Have the final approved shop drawings been received?
Has the final approved O&M manual been received?
Has the manufacturer inspected the installation?
Has a manufacturer startup occurred?
Has the manufacturer O&M training occurred?
Is the equipment covered by a new or existing online training module?
Have spare parts been received and turned over to the Treatment Division?
Has the functionality of the manufacturer control system been demonstrated?
Has the vendor control panel/facility SCADA system interface been successfully demonstrated?
Have electrical and control checks been completed?
Has the warranty been received?
Checklist by GoAudits. This checklist is an example: we do not guarantee compliance with the laws applicable to your territory or industry. Seek professional advice to adapt it to your workplace or jurisdiction.
Free PDF
Download the Plant Commissioning Checklist
By downloading this checklist you agree to the GoAudits privacy policy and terms of service.
NEW! Try generating a custom checklist with our free AI tool:
Easy inspection app for your digital checklists
- Conduct inspections anytime, anywhere - even offline
- Capture photos as proof of compliance or areas needing attention
- Instantly generate and share detailed reports after the inspections
- Assign & track follow-up tasks, view historical trends on a centralized dashboard