New Build Snagging List

Use this New Build Snagging Checklist Template to inspect a built property, log defects, track fixes, and ensure quality before handover and final payment.

New Build Snagging List



38 questions in 13 sectionsInteractive preview: try the answers

Section 1 of 13 · 2 questions

General

  1. Have all builders’ materials and rubbish been removed from the home and garden?

  2. Are the home and garden clean and tidy?

Section 2 of 13 · 3 questions

Decorations

  1. Is the plasterwork smooth and neatly finished around sockets, switches, pipes, etc.?

  2. Are plasterboard joints and nail fixings invisible?

  3. Is the decoration throughout the home complete and to a consistently acceptable standard?

Section 3 of 13 · 4 questions

Flooring

  1. Are you happy that the timber floors don’t creak excessively?

  2. Has sheet flooring been laid level and is it free of bubbling or unevenness beneath the covering

  3. that might cause premature failure?

  4. Is floor tiling fully adhered (i.e. sounding hollow if tapped) and fully grouted?

Section 4 of 13 · 3 questions

Heating And Electrical

  1. Do all light fittings and socket outlets work?

  2. Are radiators securely fixed and free of leaks?

  3. Is exposed horizontal and vertical pipework adequately supported? Are the joints leak-free?

Section 5 of 13 · 7 questions

Kitchens And Bathrooms

  1. Are all kitchen units and appliances clean and undamaged?

  2. Are all the sanitary fittings clean and undamaged?

  3. Is the water flow to taps, showers, and appliances satisfactory?

  4. Are any leaks evident beneath sinks, sanitary ware, and appliances?

  5. Are waste pipes checked for leaks?

  6. Do all doors and drawers to kitchen units operate correctly?

  7. Are extractor fans fitted and operating?

Section 6 of 13 · 2 questions

Lofts

  1. Is the loft space fully insulated?

  2. Is boarding provided to give access to tanks etc.?

Section 7 of 13 · 2 questions

Wall Tiling

  1. Is wall tiling fully adhered (i.e. sounding hollow if tapped) and fully grouted?

  2. Has a flexible sealant been provided at corners and junctions with shower trays, baths, basins, and kitchen units?

Section 8 of 13 · 6 questions

Windows And Doors

  1. Are keys supplied for all window and door locks?

  2. Do all locks and handles work and operate freely?

  3. Do all windows and doors open and shut properly and engage with the weather seals?

  4. Do self-closing devices, where fitted, fully close the doors after opening?

  5. Is all glazing crack-free?

  6. Are double-glazed units free of condensation between the panes?

Section 9 of 13 · 1 question

Decorations

  1. Are external decorations complete and to a consistently acceptable standard?

Section 10 of 13 · 3 questions

Drainage

  1. Do gutters and downpipes appear securely fixed and complete?

  2. Are they leak-free during rainfall?

  3. Are gullies and inspection chambers free of debris?

Section 11 of 13 · 2 questions

Fences And Gates

  1. Are all fences and gates complete?

  2. Are timber or steel parts protected?

Section 12 of 13 · 1 question

Paths And Drives

  1. Are all paths and drives complete and laid to an even finish?

Section 13 of 13 · 2 questions

Roof Coverings

  1. Do any tiles or slates appear cracked or loose?

  2. Are all lead flashings complete and secure?

Checklist by GoAudits. This checklist is an example: we do not guarantee compliance with the laws applicable to your territory or industry. Seek professional advice to adapt it to your workplace or jurisdiction.

Free PDF

Download the New Build Snagging List

By downloading this checklist you agree to the GoAudits privacy policy and terms of service.

NEW! Try generating a custom checklist with our free AI tool:

Easy inspection app for your digital checklists