- Library
- Construction
- New Build Handover Checklist
New Build Handover Checklist
30 questions in 6 sectionsInteractive preview: try the answers
Section 1 of 6 · 5 questionsExterior Inspection
Is the roof complete and free from visible damage or leaks?
Are gutters and downpipes securely installed and free from blockages?
Is the external paint or cladding finish even and undamaged?
Are windows and doors properly sealed, lockable, and opening smoothly?
Is the driveway or external paving complete, level, and free from cracks?
Section 2 of 6 · 5 questionsInterior Fixtures & Finishes
Are all walls and ceilings finished properly with no cracks, chips, or stains?
Is the flooring installed correctly and free of damage throughout the property?
Are all internal doors aligned, fitted with handles, and closing securely?
Are the skirting boards and architraves neatly fitted and painted?
Are staircases stable, with secure handrails and even steps?
Section 3 of 6 · 5 questionsUtilities & Services
Is the electrical system fully operational with all sockets, lights, and switches tested?
Is the plumbing system functioning with no leaks and appropriate water pressure?
Are the heating and cooling systems installed and working as intended?
Is the water heater or boiler commissioned and producing hot water?
Has the ventilation system been tested for proper airflow and operation?
Section 4 of 6 · 5 questionsKitchens & Bathrooms
Are all kitchen units fitted securely and properly aligned?
Are kitchen appliances installed, connected, and functioning as specified?
Are bathroom fittings such as sinks, toilets, and showers installed without leaks or cracks?
Is the tiling around wet areas finished neatly and sealed to prevent water ingress?
Are extractor fans working in bathrooms and kitchens where required?
Section 5 of 6 · 5 questionsSafety & Compliance
Are smoke alarms and carbon monoxide detectors installed and tested?
Are staircases, balconies, and high windows fitted with appropriate safety features?
Have all required building control inspections been completed and certified?
Is the property compliant with local building codes and regulations?
Has the Energy Performance Certificate (EPC) been issued?
Section 6 of 6 · 5 questionsDocumentation & Handover
Has the homeowner received manuals for appliances and systems?
Has a copy of the warranty or guarantee documents been provided?
Is a snagging list available and signed off where applicable?
Has the final inspection or walkthrough with the buyer been completed?
Is a handover certificate or occupancy permit ready for issuance?
Checklist by GoAudits. This checklist is an example: we do not guarantee compliance with the laws applicable to your territory or industry. Seek professional advice to adapt it to your workplace or jurisdiction.
Free PDF
Download the New Build Handover Checklist
By downloading this checklist you agree to the GoAudits privacy policy and terms of service.
NEW! Try generating a custom checklist with our free AI tool:
Easy inspection app for your digital checklists
- Conduct inspections anytime, anywhere - even offline
- Capture photos as proof of compliance or areas needing attention
- Instantly generate and share detailed reports after the inspections
- Assign & track follow-up tasks, view historical trends on a centralized dashboard