Manufacturing End of Shift Report Template

Manufacturing End of Shift Report Template for production supervisors to handover operations to the next shift, recording key metrics, events, and open actions.

Manufacturing End of Shift Report Template



35 questions in 7 sectionsInteractive preview: try the answers

Section 1 of 7 · 6 questions

Production Output

  1. Line or cell, product, and batch or SKU numbers run this shift

  2. Total good units produced this shift

  3. Shift production target and variance against actual output

  4. Output counts are taken from the production system or line counter, not estimated

  5. Number of changeovers completed and total changeover time

  6. Changeovers scheduled for the next shift are recorded

Section 2 of 7 · 5 questions

Downtime And Losses

  1. Each unplanned stop is logged as a separate event with a reason code

  2. Total unplanned downtime minutes for the shift

  3. Planned downtime taken matches the shift schedule

  4. Lines run at reduced speed are recorded with the reason

  5. Repeat stops on the same equipment are reported to maintenance

Section 3 of 7 · 5 questions

Quality

  1. Scrap quantity and main scrap reason for the shift

  2. Rework quantity and main rework reason, recorded separately from scrap

  3. First-pass yield percentage for the shift

  4. In-process quality checks were completed at the required frequency

  5. Every out-of-spec result has a deviation or nonconformance report raised

Section 4 of 7 · 5 questions

Safety

  1. Safety incidents, near misses, and first aid cases during the shift

  2. An incident or near-miss report is submitted for every event recorded

  3. Hazards or unsafe conditions found during the shift are reported

  4. Permits to work still open at shift end are listed with the permit holder

  5. Lockouts continuing into the next shift are transferred with the incoming lock applied first

Section 5 of 7 · 7 questions

Line Walk At Shift End

  1. Each line's actual status (running, down, or restricted) matches this report

  2. Temporary bypasses, overrides, or manual modes still in force, and who authorized each one

  3. No temporary bypass or override is active without written authorization

  4. Guards and interlocks are in place on all running equipment

  5. Product on quality hold is tagged and physically segregated

  6. Work in progress is labeled with product, quantity, and status

  7. Walkways and work areas are clear of scrap, spills, and obstructions

Section 6 of 7 · 4 questions

People And Materials

  1. Staff on shift against planned headcount, with absences noted

  2. Operators assigned to each line hold the required training sign-off

  3. Raw material or packaging shortages that will affect the next shift

  4. Spare parts or consumables used up this shift are reordered or flagged

Section 7 of 7 · 3 questions

Open Items For The Next Shift

  1. Open actions handed over, each with an owner and due time

  2. The single highest-priority issue for the next shift to watch

  3. This report was reviewed face to face with the incoming supervisor

Checklist by GoAudits. This checklist is an example: we do not guarantee compliance with the laws applicable to your territory or industry. Seek professional advice to adapt it to your workplace or jurisdiction.

Free PDF

Download the Manufacturing End of Shift Report Template