Hydrostatic Test Report Template
57 questions in 8 sectionsInteractive preview: try the answers
Section 1 of 8 · 5 questionsTest Identification
The system, line or equipment number under test is recorded
The approved test procedure or test pack reference is recorded
The test boundary is defined by drawing and isolation point
The test supervisor, witness and contractor are named
The report reference number is recorded against the test pack
Section 2 of 8 · 9 questionsPre-Test Preparations
Welds within the test boundary are complete and released for testing
Joints and fittings have been visually examined with defects cleared
Test blinds are installed at every boundary and listed on a blind register
End caps and closures are rated for the test pressure
Valves within the boundary are set to the positions required by the procedure
Equipment unable to withstand test pressure has been isolated or removed
Instruments, relief valves and expansion joints are removed or blanked
Temporary supports are rated for the weight of the system filled with water
Spring hangers and supports are pinned where the procedure requires it
Section 3 of 8 · 7 questionsTest Medium And Instrumentation
The test medium matches the procedure and is clean and free of debris
Chloride content of the test water is within limits for stainless steel systems
The metal temperature is above the minimum required to avoid brittle fracture
Gauge calibration certificates are current for every gauge in use
Gauge range is selected so the test pressure falls in the middle of the scale
A second gauge or chart recorder is fitted where the procedure requires it
The pressure relief device is set below the lowest rated component in the boundary
Section 4 of 8 · 6 questionsTest Parameters
The specified test pressure from the approved procedure is recorded
The actual test pressure achieved is recorded
The required hold time and the observed hold time are both recorded
Ambient and fluid temperatures at the start and end of the test are recorded
Start and end pressure readings are recorded with the times taken
Readings were taken at the intervals specified in the procedure
Section 5 of 8 · 8 questionsTest Procedure And Safety Controls
The system was vented at all high points until free of air during filling
The system was filled slowly at the rate stated in the procedure
Pressure was raised in stages with a hold at each stage
An exclusion zone was established and maintained throughout the test
Personnel remained clear of blind flanges, closures and threaded connections
Nobody approached the system while it was held at full test pressure
The system was not left pressurised unattended
Joints and welds were examined only after pressure was reduced to inspection level
Section 6 of 8 · 7 questionsResults And Observations
Pressure was maintained for the full duration without a drop beyond tolerance
The system remained free of visible leakage at all joints and connections
No permanent deformation or distress was observed in any component
Any leaks or defects found are recorded with their location
Corrective work and any retest are recorded against the original test
Observations are supported by photographs or gauge chart records
The test meets the acceptance criteria stated in the approved procedure
Section 7 of 8 · 8 questionsDepressurisation And Reinstatement
Pressure was released in a controlled sequence at the rate stated in the procedure
Vents were opened before draining to prevent vacuum forming in the system
The system was drained completely with no water left in low points
The system was dried where the service requires it
Test water was disposed of in line with environmental requirements
Every blind listed on the register has been removed and signed off
Relief valves, instruments and removed components have been reinstated
Valves and supports have been returned to their operating positions
Section 8 of 8 · 7 questionsCertification And Sign-Off
The responsible engineer has certified the test result
The test was witnessed by the client or third-party inspector where required
Contractor and client representatives have signed the report
The approval carries signatures, dates and stamps as required
Gauge calibration certificates are attached to the report
Photographs and gauge charts are attached to the report
The completed report is filed against the system and the test pack
Checklist by GoAudits. This checklist is an example: we do not guarantee compliance with the laws applicable to your territory or industry. Seek professional advice to adapt it to your workplace or jurisdiction.
Free PDF
Download the Hydrostatic Test Report Template
By downloading this checklist you agree to the GoAudits privacy policy and terms of service.
NEW! Try generating a custom checklist with our free AI tool:
Easy inspection app for your digital checklists
- Conduct inspections anytime, anywhere - even offline
- Capture photos as proof of compliance or areas needing attention
- Instantly generate and share detailed reports after the inspections
- Assign & track follow-up tasks, view historical trends on a centralized dashboard