- Library
- Construction
- Home Renovation Punch List Template
Home Renovation Punch List Template
34 questions in 7 sectionsInteractive preview: try the answers
Section 1 of 7 · 6 questionsExterior & Building Envelope
All exterior siding, brickwork, or stucco is free of damage, staining, and construction debris.
Site drainage is functioning correctly with no evidence of water pooling near the foundation.
All gutters and downspouts are securely attached and clear of leaves or building materials.
Exterior paint and trim finishes are even with no visible missed spots or uneven sheen.
All external lighting, doorbells, and security cameras are fully operational.
Driveways, pathways, and patios are free of cracks or concrete splatter.
Section 2 of 7 · 5 questionsInterior Walls, Ceilings & Paint
Drywall finishes are smooth and free of visible joints, screw heads, or tape failures.
Paint coverage is consistent across all surfaces with no scuffs, drips, or flashing.
Texture uniformity is maintained throughout every room and transition area.
All crown molding, baseboards, and casing are installed with tight miters and no visible gaps.
Ceiling fans and recessed lighting trim are installed flush and level with no gaps at the ceiling line.
Section 3 of 7 · 4 questionsFloors & Transitions
All flooring materials (hardwood, tile, carpet) are free of scratches, chips, or construction damage.
Floor transitions and thresholds are secure, flush, and free of trip hazards.
Grout lines in tiled areas are consistent in width and color, and have been properly sealed.
The floor is level and free of hollow spots or squeaks when walked upon.
Section 4 of 7 · 5 questionsDoors, Windows & Hardware
All interior and exterior doors swing freely and latch securely without sticking.
Window panes are clean, free of scratches, and operate smoothly in their tracks.
All hardware — knobs, pulls, and hinges — is installed straight and matches the specified finish.
Weatherstripping and door sweeps are correctly installed and provide a complete seal against drafts.
Cabinet doors and drawers in kitchens and bathrooms are perfectly aligned and soft-close as intended.
Section 5 of 7 · 6 questionsMechanical, Electrical & Plumbing (MEP)
All electrical outlets and switches have been tested for functionality and correct polarity.
The electrical panel is clearly labeled with all circuits identified and all breakers in the on position.
All plumbing fixtures are leak-free, with hot and cold water verified at all taps.
Water pressure is adequate at all fixtures and drains flow freely without gurgling.
All affected HVAC zones are fully functional and responsive to thermostat controls.
Exhaust fans in bathrooms and kitchens are operational and vented correctly to the exterior.
Section 6 of 7 · 4 questionsFire & Life Safety
Smoke and Carbon Monoxide detectors are installed on every level and verified as operational.
All fire egress routes and windows are clear and unobstructed.
Handrails on any modified or new stairways are securely anchored and meet local height requirements.
All GFCIs near water sources are tested and reset correctly.
Section 7 of 7 · 4 questionsFinal Cleanliness & Handover
All construction debris, protective plastic, and blue tape have been removed from the site.
All surfaces — including windows inside and out, countertops, and floors — have been deep-cleaned.
All affected utilities have been restored and are fully functional for the homeowner's use.
A complete set of keys, garage remotes, and any new appliance manuals is ready for the homeowner.
Checklist by GoAudits. This checklist is an example: we do not guarantee compliance with the laws applicable to your territory or industry. Seek professional advice to adapt it to your workplace or jurisdiction.
Free PDF
Download the Home Renovation Punch List Template
By downloading this checklist you agree to the GoAudits privacy policy and terms of service.
NEW! Try generating a custom checklist with our free AI tool:
Easy inspection app for your digital checklists
- Conduct inspections anytime, anywhere - even offline
- Capture photos as proof of compliance or areas needing attention
- Instantly generate and share detailed reports after the inspections
- Assign & track follow-up tasks, view historical trends on a centralized dashboard