- Library
- Logistics & Supply Chain
- Container Loading and Stuffing Checklist
Container Loading and Stuffing Checklist
33 questions in 7 sectionsInteractive preview: try the answers
Section 1 of 7 · 4 questionsPre-Loading Documents
Packing list and load plan are available at the loading bay
Method for declaring verified gross mass (VGM) is confirmed
Dangerous goods documents and labels are prepared, where applicable
Seal issued for this container is recorded against the shipment
Section 2 of 7 · 4 questionsContainer Acceptance
Container number, size, and type match the booking
7-point container inspection is completed and passed
Container is clean, dry, and free of odors
Refrigerated containers are pre-cooled to the required setpoint
Section 3 of 7 · 5 questionsCargo Check Before Stuffing
Cargo count matches the packing list
Cartons and packaging are undamaged and dry
Shipping marks and labels match the packing list
Pallets are sound and wood packaging carries the ISPM 15 mark
Product samples are checked against the order, where QC requires it
Section 4 of 7 · 6 questionsStuffing
Cargo is loaded in the sequence set in the load plan
Heavy cargo is placed at the bottom, with lighter cargo on top
Weight is spread evenly along the length and width of the container
Total cargo weight stays within the container's maximum payload
Fragile and orientation-marked cargo is loaded as marked
Photos are taken at set fill stages during loading
Section 5 of 7 · 4 questionsSecuring
Voids are filled with dunnage, airbags, or blocking
Cargo is lashed to the container's lashing points where required
No cargo rests against the doors
Door end is secured with a brace, net, or strapping
Section 6 of 7 · 5 questionsClosing And Sealing
Final cargo count is reconciled with the packing list
Loaded container is photographed before the doors close
Seal is applied and its number matches the shipping documents
Dangerous goods placards are displayed on the container, where applicable
VGM is declared to the carrier before the cutoff
Section 7 of 7 · 5 questionsDestuffing On Arrival
Seal is intact and its number matches the shipping documents
Cargo has not shifted, collapsed, or fallen against the doors
Visible damage is photographed before cargo is removed
Unloaded count matches the packing list
Container interior shows no water ingress or condensation damage
Checklist by GoAudits. This checklist is an example: we do not guarantee compliance with the laws applicable to your territory or industry. Seek professional advice to adapt it to your workplace or jurisdiction.
Free PDF
Download the Container Loading and Stuffing Checklist
By downloading this checklist you agree to the GoAudits privacy policy and terms of service.
NEW! Try generating a custom checklist with our free AI tool:
Easy inspection app for your digital checklists
- Conduct inspections anytime, anywhere - even offline
- Capture photos as proof of compliance or areas needing attention
- Instantly generate and share detailed reports after the inspections
- Assign & track follow-up tasks, view historical trends on a centralized dashboard