- Library
- Food & Hospitality
- Commercial Dishwasher Maintenance Checklist
Commercial Dishwasher Maintenance Checklist
61 questions in 10 sectionsInteractive preview: try the answers
Section 1 of 10 · 5 questionsMachine Setup And Data Plate
The data plate is present, legible and matches the machine in use
The machine is operated in accordance with the data plate settings
Temperature measuring devices are fitted for each wash and rinse tank
A temperature measuring device reads the final rinse at the manifold
An irreversible registering temperature indicator is available and accessible
Section 2 of 10 · 6 questionsSanitizing Rinse Temperature
The final rinse at the manifold reaches at least 180°F (82°C)
Stationary rack single temperature machines reach at least 165°F (74°C)
The final rinse at the manifold does not exceed 194°F (90°C)
Utensil surface temperature reaches at least 160°F (71°C) on a test run
Surface temperature is verified with a thermolabel or maximum registering thermometer
The booster heater brings the rinse to temperature within the expected time
Section 3 of 10 · 5 questionsWash Temperature And Rinse Pressure
Wash tank temperature meets the minimum stated for this machine type
Stationary rack dual temperature and multitank conveyor machines wash at 150°F (66°C) or above
Single tank conveyor dual temperature machines wash at 160°F (71°C) or above
Chemical sanitizing machines wash at 120°F (49°C) or above
Final rinse flow pressure is within the data plate range, between 5 and 30 psi
Section 4 of 10 · 9 questionsChemical Sanitizing And Dispensing
Chlorine sanitizer concentration measures between 50 and 100 ppm
Quaternary ammonium concentration measures at least 200 ppm per the product label
Iodine sanitizer concentration measures between 12.5 and 25 ppm
A test kit matched to the sanitizer in use is available and in date
Detergent and sanitizer are dispensed automatically on every cycle
The alarm signals when detergent or sanitizer is not delivered
Chemical containers have stock remaining and pickup tubes are fully submerged
Dosing pump tubes and suction lances show no cracking, hardening or leakage
Dispenser settings match the chemical supplier's specification
Section 5 of 10 · 6 questionsWash And Rinse Arms
Wash and rinse arms are removed and inspected at the scheduled interval
Nozzles are clear of limescale, food solids, foil and cocktail sticks
Arm gaskets are intact with no stringy food wrapped around them
Arms rotate freely when refitted
End caps and plugs are present and correctly seated
Arms are locked into position before the machine is run
Section 6 of 10 · 7 questionsTanks, Screens And Drainage
Scrap screens and strainer baskets are removed, cleaned and refitted
Pump intake strainers are clean and correctly seated
Tank and drain screens are free from debris
The overflow tube is removed, cleaned and refitted
Tank water is changed at the scheduled frequency
The drain closes fully with no soil obstructing the seat
The drain line has an air gap or approved backflow prevention
Section 7 of 10 · 6 questionsInterior, Door And Racks
Interior walls, corners and door guides are free from food residue
Curtains are scrubbed, rinsed and dried at the end of each day
Curtains show no tears, wear or missing hooks
Door gaskets seal fully with no splits or hardening
Doors and curtains are left open overnight to air dry
Racks are undamaged with no broken or missing tines
Section 8 of 10 · 5 questionsDeliming And Water Quality
Deliming is carried out at the interval set by local water hardness
The heating element is free from scale buildup
Interior surfaces are free from limescale and mineral deposits
Water softener salt level and regeneration are checked where fitted
Only stainless-safe products are used, with no bleach, chlorine detergents or steel wool
Section 9 of 10 · 7 questionsMechanical Condition And Records
The wash pump runs without unusual noise, vibration or seal leakage
The conveyor drive advances racks smoothly on conveyor machines
No leaks are present at hoses, seals or connections during a full cycle
Electrical connections show no scorching, corrosion or exposed conductors
Temperature and sanitizer readings are logged at the required frequency
Faults and service visits since the last check are recorded
Staff on shift can demonstrate how to check temperature and sanitizer concentration
Section 10 of 10 · 5 questionsDaily Start-up Verification
All screens, overflows and pump strainers are refitted before filling
Curtains are installed and correctly positioned
Wash and rinse arms are locked in place
The machine fills and heats to operating temperature before first use
An empty cycle is run at high temperature before service begins
Checklist by GoAudits. This checklist is an example: we do not guarantee compliance with the laws applicable to your territory or industry. Seek professional advice to adapt it to your workplace or jurisdiction.
Free PDF
Download the Commercial Dishwasher Maintenance Checklist
By downloading this checklist you agree to the GoAudits privacy policy and terms of service.
NEW! Try generating a custom checklist with our free AI tool:
Easy inspection app for your digital checklists
- Conduct inspections anytime, anywhere - even offline
- Capture photos as proof of compliance or areas needing attention
- Instantly generate and share detailed reports after the inspections
- Assign & track follow-up tasks, view historical trends on a centralized dashboard