Building Handover Inspection Checklist

Use this Building Construction Handover Inspection form for thorough quality control of buildings and facilities. Check the condition and capture any issues in the outdoors areas, building exterior, balconies, decks and verandahs, parking, frame, roof structure, floors, interior rooms, bathroom facilities etc.

Building Handover Inspection Checklist



211 questions in 23 sectionsInteractive preview: try the answers

Section 1 of 23 · 10 questions

Site Conditions

  1. Access

  2. Site gradient

  3. General soil type

  4. Soil erosion & sediment control

  5. Orientation

  6. Weather conditions

  7. Surface drainage

  8. Subsidence

  9. Seepage

  10. Termite nesting sites & conditions conducive to termites

Section 2 of 23 · 14 questions

Site Improvements/Conditions

  1. Landscaping

  2. Finished ground level adjacent to building

  3. Finished slab height

  4. Driveways / access / slope

  5. Crossover

  6. Paving

  7. Gates & Fencing generally

  8. Builders sign/site identification

  9. Stormwater pipes

  10. Sanitary drainage

  11. Termite control noted including type and location of barriers i.e. to drainage pipes

  12. Termite notices

  13. Retaining walls & location

  14. Visually check site clear of building rubbish and materials appropriately stored

Section 3 of 23 · 2 questions

Outbuildings

  1. Shed structural adequacy, materials, workmanship

  2. Pergola structural adequacy, materials, workmanship

Section 4 of 23 · 20 questions

External

  1. Piers / stumps

  2. Foundations

  3. Walls

  4. Damp proofing

  5. Weatherproofing of single leaf masonry

  6. Tie-downs

  7. Doors - for correct clearances and function

  8. Door locks

  9. Windows & sills - for bows, sagging and twists

  10. Lintels

  11. Weep holes

  12. External paint finish

  13. Glazing for scratches and chips

  14. Safety switch

  15. Vermin Proofing

  16. Hot water heater, drainage and platform

  17. Air conditioning unit installation and drainage

  18. Gas bottles - gas pipes no contact

  19. Double storey return air duct sealed

  20. Letterbox

Section 5 of 23 · 13 questions

Brickwork

  1. Control joints location and waterproofing

  2. Weep holes

  3. Control joints appropriately located and sealed

  4. Mortar strength and finish

  5. Chipped bricks

  6. Perimeter flashing first floor

  7. Weep holes above windows

  8. Walls straight, plumb and correctly bearing on slab

  9. Perpends (intersecting wall) and bed joints

  10. Window sills - correct clearances

  11. Half or full height piers

  12. Bagging to brickwork

  13. Termite barrier on correct course

Section 6 of 23 · 3 questions

Balcony

  1. Structural adequacy

  2. Materials

  3. Workmanship

Section 7 of 23 · 3 questions

Patio

  1. Structural adequacy

  2. Materials

  3. Workmanship

Section 8 of 23 · 3 questions

Porch

  1. Structural adequacy

  2. Materials

  3. Workmanship

Section 9 of 23 · 5 questions

Verandah

  1. Structural adequacy

  2. Materials

  3. Workmanship including: o Framing

  4. Workmanship including: o Stirrups

  5. Workmanship including: o Heights

Section 10 of 23 · 3 questions

Deck

  1. Structural adequacy

  2. Materials

  3. Workmanship

Section 11 of 23 · 3 questions

Carport

  1. Structural adequacy

  2. Materials

  3. Workmanship

Section 12 of 23 · 27 questions

Frame

  1. Subfloor frame clearance

  2. Truss clearances over internal walls

  3. Masonry brick/block structural walls

  4. Battens fixed to rafters

  5. Fire rated elements - Party walls

  6. Binders in place and fixed at ends

  7. Floor member size and spacing

  8. Floor bracing and tie downs

  9. Wall frame secure and straight at top & bottom plates

  10. Corners and walls plumb

  11. Roof frame member size and spacing

  12. Construction of window and door openings - heights, directions, plumb and level

  13. Blocking and nogging for wall and ceiling linings

  14. Ceiling frame member size and spacing

  15. Ceiling heights

  16. Lintels tight and to list

  17. Aluminium door frame brackets

  18. Position of external wall frame in relation to slab

  19. Roof frame member size and spacing

  20. Roof frame bracing

  21. Roof frame tie downs

Checklist by GoAudits. This checklist is an example: we do not guarantee compliance with the laws applicable to your territory or industry. Seek professional advice to adapt it to your workplace or jurisdiction.

Free PDF

Download the Building Handover Inspection Checklist