- Building Handover Inspection Checklist
Building Handover Inspection Checklist
211 questions in 23 sectionsInteractive preview: try the answers
Section 1 of 23 · 10 questionsSite Conditions
Access
Site gradient
General soil type
Soil erosion & sediment control
Orientation
Weather conditions
Surface drainage
Subsidence
Seepage
Termite nesting sites & conditions conducive to termites
Section 2 of 23 · 14 questionsSite Improvements/Conditions
Landscaping
Finished ground level adjacent to building
Finished slab height
Driveways / access / slope
Crossover
Paving
Gates & Fencing generally
Builders sign/site identification
Stormwater pipes
Sanitary drainage
Termite control noted including type and location of barriers i.e. to drainage pipes
Termite notices
Retaining walls & location
Visually check site clear of building rubbish and materials appropriately stored
Section 3 of 23 · 2 questionsOutbuildings
Shed structural adequacy, materials, workmanship
Pergola structural adequacy, materials, workmanship
Section 4 of 23 · 20 questionsExternal
Piers / stumps
Foundations
Walls
Damp proofing
Weatherproofing of single leaf masonry
Tie-downs
Doors - for correct clearances and function
Door locks
Windows & sills - for bows, sagging and twists
Lintels
Weep holes
External paint finish
Glazing for scratches and chips
Safety switch
Vermin Proofing
Hot water heater, drainage and platform
Air conditioning unit installation and drainage
Gas bottles - gas pipes no contact
Double storey return air duct sealed
Letterbox
Section 5 of 23 · 13 questionsBrickwork
Control joints location and waterproofing
Weep holes
Control joints appropriately located and sealed
Mortar strength and finish
Chipped bricks
Perimeter flashing first floor
Weep holes above windows
Walls straight, plumb and correctly bearing on slab
Perpends (intersecting wall) and bed joints
Window sills - correct clearances
Half or full height piers
Bagging to brickwork
Termite barrier on correct course
Section 6 of 23 · 3 questionsBalcony
Structural adequacy
Materials
Workmanship
Section 7 of 23 · 3 questionsPatio
Structural adequacy
Materials
Workmanship
Section 8 of 23 · 3 questionsPorch
Structural adequacy
Materials
Workmanship
Section 9 of 23 · 5 questionsVerandah
Structural adequacy
Materials
Workmanship including: o Framing
Workmanship including: o Stirrups
Workmanship including: o Heights
Section 10 of 23 · 3 questionsDeck
Structural adequacy
Materials
Workmanship
Section 11 of 23 · 3 questionsCarport
Structural adequacy
Materials
Workmanship
Section 12 of 23 · 27 questionsFrame
Subfloor frame clearance
Truss clearances over internal walls
Masonry brick/block structural walls
Battens fixed to rafters
Fire rated elements - Party walls
Binders in place and fixed at ends
Floor member size and spacing
Floor bracing and tie downs
Wall frame secure and straight at top & bottom plates
Corners and walls plumb
Roof frame member size and spacing
Construction of window and door openings - heights, directions, plumb and level
Blocking and nogging for wall and ceiling linings
Ceiling frame member size and spacing
Ceiling heights
Lintels tight and to list
Aluminium door frame brackets
Position of external wall frame in relation to slab
Roof frame member size and spacing
Roof frame bracing
Roof frame tie downs
Checklist by GoAudits. This checklist is an example: we do not guarantee compliance with the laws applicable to your territory or industry. Seek professional advice to adapt it to your workplace or jurisdiction.
Free PDF
Download the Building Handover Inspection Checklist
By downloading this checklist you agree to the GoAudits privacy policy and terms of service.
NEW! Try generating a custom checklist with our free AI tool:
Easy inspection app for your digital checklists
- Conduct inspections anytime, anywhere - even offline
- Capture photos as proof of compliance or areas needing attention
- Instantly generate and share detailed reports after the inspections
- Assign & track follow-up tasks, view historical trends on a centralized dashboard