Arc Flash Compliance Checklist (NFPA 70E)

Arc Flash Compliance Checklist for facility and electrical safety managers. Use this NFPA 70E compliance template to audit risk assessments, training, PPE.

Arc Flash Compliance Checklist (NFPA 70E)



35 questions in 7 sectionsInteractive preview: try the answers

Section 1 of 7 · 5 questions

Desk Review: Electrical Safety Program

  1. A written electrical safety program covers arc flash and shock hazards

  2. Program names who is responsible for electrical safety at the site

  3. Program defines when energized work is permitted and how it is approved

  4. Electrical safety program is audited at least every three years

  5. Field work is audited at least once a year against the program

Section 2 of 7 · 6 questions

Desk Review: Risk Assessment And Documentation

  1. Arc flash risk assessment covers all equipment that may be worked on while energized

  2. Arc flash risk assessment was reviewed within the last five years

  3. Risk assessment is updated after major modifications or renovations

  4. Single-line diagram is current and matches the installed system

  5. Assessment documents incident energy or PPE category for each piece of equipment

  6. Shock risk assessment defines limited and restricted approach boundaries

Section 3 of 7 · 5 questions

Desk Review: Training And Qualification

  1. Qualified persons are designated for the tasks they perform

  2. Qualified persons received electrical safety training within the last three years

  3. Training records show content, date, and trainee proficiency

  4. Unqualified workers who work near electrical hazards have received awareness training

  5. Workers exposed to shock hazards have current contact release and first aid training

Section 4 of 7 · 4 questions

Desk Review: Energized Work And Lockout

  1. Energized work permits are completed and approved before energized work starts

  2. Each energized work permit records why the equipment cannot be de-energized

  3. Lockout/tagout procedures cover all electrical energy sources

  4. Procedures require testing for absence of voltage before work starts

Section 5 of 7 · 5 questions

Site Walkthrough: Equipment Labels

  1. Arc flash labels are present on switchboards, panelboards, and control panels

  2. Labels are legible and undamaged

  3. Labels show nominal voltage and the arc flash boundary

  4. Labels show incident energy or the required PPE category

  5. Label information matches the current risk assessment

Section 6 of 7 · 4 questions

Site Walkthrough: Electrical Rooms And Boundaries

  1. Electrical rooms are locked and accessible only to authorized persons

  2. Working clearance in front of electrical equipment is free of storage

  3. Panel and enclosure covers are closed and secured

  4. Warning signs are posted at electrical rooms and high-voltage areas

Section 7 of 7 · 6 questions

Site Walkthrough: PPE And Tools

  1. Arc-rated PPE is available for the PPE categories identified in the risk assessment

  2. Arc-rated clothing and face shields are clean and undamaged

  3. Voltage-rated gloves are within their electrical test date

  4. Insulated tools show no damaged or cracked insulation

  5. Voltage testers are available and checked on a known live source before use

  6. Inspections of arc-rated PPE are recorded

Checklist by GoAudits. This checklist is an example: we do not guarantee compliance with the laws applicable to your territory or industry. Seek professional advice to adapt it to your workplace or jurisdiction.

Free PDF

Download the Arc Flash Compliance Checklist (NFPA 70E)

By downloading this checklist you agree to the GoAudits privacy policy and terms of service.

NEW! Try generating a custom checklist with our free AI tool:

Easy inspection app for your digital checklists